- lot 1: supply and installation of 855 ml cast iron ø600 and 880 ml cast iron ø500;
- lot 2: supply and installation of 5 510 ml cast iron ø500;
- lot 3: supply and installation of 585 ml cast iron ø300;
- lot 4: supply and installation of 815 ml cast iron ø500.
Connection pipes from the future drinking water plant to the GaronneSupply and installation of 855 ml of ø600 and 880 ml of ø500.
Connection pipe from connection point B of lot 1 to the Labarthe reservoirSupply and installation of ø500 cast iron on 5510 ml.
Connection pipes from the future drinking water plant to Saubens and to discharge in the GaronneSupply and installation of ø300 cast iron on 585 ml.
Connection pipe from connection point D of lot 1 to Muret with crossing of the GaronneSupply and installation of 815 ml of ø500 cast iron.