As a replacement for the no longer rehabilitated penitentiary at the garden yard in Münster, a new building in the east of the city of Münster is to be created. On an approx. 180 000 m
- Level 1: Participation contest with 5 participants for participation in level 2,
- Level 2: negotiated procedure.
Execution of duties according to § 12 SV-VO 2009 in connection with the project new construction of the prison Münster. The performance includes the examination of the documents of the stability certificate, including the static-constructive fire protection for the construction project Neubau JVA Münster.
The testing services include the following buildings:
Gate / Administration / Technology
Chamber / Visitors
Automotive Hall
Reinforced secure adhesion area
Administration / Health
Bondhouse 1 + 2
Bondhouse 3 + 4
meeting center
Gym
Workshop 1
Workshop 2
Workshop 3
Kitchen / educational center
Crossings above ground
Underground passageways
prison wall
Related buildings
In addition, the proof of stability must be checked for different facades of the same type.