The subject of the contract is services in the field of forest management as defined in Article 6 (1) point 1 of the Act of 28 September 1991 on forests (text one: Journal of Laws of 2021 item 1275 as late as “Forests Act”) covering works in the field of forest breeding and protection, fire protection, harvesting and ripping of forest seed wood, selection of forest trees, forest nursery and trees to be carried out in the Oleszyce Forest District in 2022. The scope of the object of the contract includes the total quantities of works in the field of forest breeding and protection, fire protection, the harvesting and rip-off of forest seed wood, forest tree selection, nursery and tree trees resulting from Annex 3 to the SWZ, which consist of:
Annex No 3.1. — work size by group of activities, activities and location;
Annex 3.2. — a statement of the distance and conditions of timber breaking;
Annex 3.3. — information on the use of possible acquisition technologies
Services in the field of logging and logging in Podlisze Forestry1. The subject of the contract is services in the field of forest management as defined in Article 6 (1) point 1 of the Act of 28 September 1991 on forests (text one: Journal of Laws of 2021, item 1275, as late as “Forests Act”) covering works in the field of logging and logging.
2. The scope of the object of the contract shall include the summary quantities of work indicated in point 1 resulting from Annex 3 to the SWZ, which shall consist of:
Annex No 3.1.1 — work size by group of activities, activities and location;
Annex 3.2. — a statement of the distance and conditions of timber breaking;
Annex 3.3. — information on the use of possible logging technologies;
3. The kind ranges compiled in Annexes No 3.1. - 3.3. are estimated
4. A detailed description of the standard of technology for the performance of individual forestry works (activities) included in the subject of the contract is set out in Annex 4.3 to SWZ (Description of the standard of technology for the implementation of forestry works).
5. Descriptions of the activity codes describing the individual forestry works (activities) included in the subject of the contract and the procedure for taking up are described in Annex No 4.3 to SWZ
6. Due to the actual natural weather situation that may occur during the execution of the subject of the contract, as well as the economic and economic situation unforeseen at the moment, the Contracting Authority reserves the right to make reductive adjustments, enhancement adjustments, new arrangements location, as well as pausing the steps indicated in each line of tables describing the subject of the order. Increasing adjustments do not imply the introduction of new works, not covered by the scope of the contract, and reductive adjustments do not imply a complete abandonment of part They should be understood as increasing the amount of work in one location (forest address) in the Package Implementation Area (including locations in the Package Implementation Area not pre-indicated in the SWZ), while reducing the amount of work in another location (forest address) on Package Implementation Area, within the total quantities of individual work falling within the scope of the Contract Subject as defined in the SWZ, to be carried out throughout the Package Implementation Area. The need to increase the size of certain elements of the procurement in the course of the performance of the contract subject may also occur in order to complete the full range of works described in the subject matter of the contract. Establishing a new location is carried out within the subject of the order, always only in the Package Redeemment Area.
7. The standardization and general principles which, in particular, the Contractor will be obliged to observe in the execution of the subject of the contract are described in paragraphs 3.2 and 3.3 of SWZ.
8. The Contracting Authority shall not reserve the obligation of the Contractor to personally perform key tasks concerning the subject of the contract. The Contractor may entrust the execution of elements (parts) of the object of the contract to subcontractors In the event of an intention to perform the subject of a contract involving subcontractors, the contractor shall indicate in his tender the parts of the contract (tangible ranges) the execution of which he intends to entrust to subcontractors and the names of possible subcontractors if they are already known.
9. The Contracting Authority in accordance with Article 95 of the PZP requires employment by the Contractor or subcontractor on the basis of the working relationship of persons performing the performance of the contract involving the acquisition and retraction of the wood material, if the performance of these activities consists in the performance of the work in the manner of referred to in Article 22 (1) of the Act of 26 June 1974 - Labour Code (text: Journal of Laws of 2020 item 1320 as amended).
Services in the field of harvesting and plucking of timber in the early days in Oleszyce Forest District1. The subject of the contract is services in the field of forest management as defined in Article 6 (1) (1) of the Act of 28 September 1991 on forests (text one: Journal of Laws of 2021 item 1275 as late as “Forests Act”) covering works in the scope of: harvesting and ripping of timber in threadbare early in the Oleszyce Forest District.
2. The scope of the object of the contract shall include the summary quantities of work indicated in point 1 resulting from Annex 3 to the SWZ, which shall consist of:
Annex No 3.1.10 — work size by group of activities, activities and location;
Annex 3.2. — a statement of the distance and conditions of timber breaking;
Annex 3.3. — information on the use of possible logging technologies;
3. The kind ranges compiled in Annexes No 3.1. - 3.3. are estimated
4. A detailed description of the standard of technology for the performance of individual forestry works (activities) included in the subject of the contract is set out in Annex 4.3 to SWZ (Description of the standard of technology for the implementation of forestry works).
5. Descriptions of the activity codes describing the individual forestry works (activities) included in the subject of the contract and the procedure for taking up are described in Annex No 4.3 to SWZ
6. Due to the actual natural weather situation that may occur during the execution of the subject of the contract, as well as the economic and economic situation unforeseen at the moment, the Contracting Authority reserves the right to make reductive adjustments, enhancement adjustments, new arrangements location, as well as pausing the steps indicated in each line of tables describing the subject of the order. Increasing adjustments do not imply the introduction of new works, not covered by the scope of the contract, and reductive adjustments do not imply a complete abandonment of part They should be understood as increasing the amount of work in one location (forest address) in the Package Implementation Area (including locations in the Package Implementation Area not pre-indicated in the SWZ), while reducing the amount of work in another location (forest address) on Package Implementation Area, within the total quantities of individual work falling within the scope of the Contract Subject as defined in the SWZ, to be carried out throughout the Package Implementation Area. The need to increase the size of certain elements of the procurement in the course of the performance of the contract subject may also occur in order to complete the full range of works described in the subject matter of the contract. Establishing a new location is carried out within the subject of the order, always only in the Package Redeemment Area.
7. The standardization and general principles which, in particular, the Contractor will be obliged to observe in the execution of the subject of the contract are described in paragraphs 3.2 and 3.3 of SWZ.
8. The Contracting Authority shall not reserve the obligation of the Contractor to personally perform key tasks concerning the subject of the contract. The Contractor may entrust the execution of elements (parts) of the object of the contract to subcontractors In the event of an intention to perform the subject of a contract involving subcontractors, the contractor shall indicate in his tender the parts of the contract (tangible ranges) the execution of which he intends to entrust to subcontractors and the names of possible subcontractors if they are already known.
9. The Contracting Authority in accordance with Article 95 of the PZP requires employment by the Contractor or subcontractor on the basis of the working relationship of persons performing the performance of the contract involving the acquisition and retraction of the wood material, if the performance of these activities consists in the performance of the work in the manner of referred to in Article 22 (1) of the Act of 26 June 1974 - Labour Code (text: Journal of Laws of 2020 item 1320 as amended).
Services in the field of forest development in the first half of the year in Forestry Podlisze1. The subject of the contract is services in the field of forest management as defined in Article 6 (1) (1) of the Act of 28 September 1991 on forests (text one: Journal of Laws of 2021 item 1275 as late as “Forests Act”) covering works in the field of: breeding and forest conservation, protection of the forest fire protection and tree-trees.
2. The scope of the subject matter of the contract shall include the total quantities of work indicated in point 1 resulting from Annex 3 to the SWZ, which consists of:
Annex No 3.1.11 — size of works by activity groups, activities and location;
3. The kind ranges compiled in Annex No 3.1.11 are estimated
4. A detailed description of the standard of technology for carrying out individual forestry works (activities) included in the subject of the contract is contained in Annexes No 4.1-4.2 to SWZ (Description of the standard of technology for the implementation of forestry works).
5. Descriptions of the activity codes describing the individual forestry works (activities) included in the subject of the contract and the procedures for taking up are described in Annexes No 4.1 — 4.2 to SWZ
6. Due to the actual natural weather situation that may occur during the execution of the subject of the contract, as well as the economic and economic situation unforeseen at the moment, the Contracting Authority reserves the right to make reductive adjustments, enhancement adjustments, new arrangements location, as well as pausing the steps indicated in each line of tables describing the subject of the order. Increasing adjustments do not imply the introduction of new works, not covered by the scope of the contract, and reductive adjustments do not imply a complete abandonment of part They should be understood as increasing the amount of work in one location (forest address) in the Package Implementation Area (including locations in the Package Implementation Area not pre-indicated in the SWZ), while reducing the amount of work in another location (forest address) on Package Implementation Area, within the total quantities of individual work falling within the scope of the Contract Subject as defined in the SWZ, to be carried out throughout the Package Implementation Area. The need to increase the size of certain elements of the procurement in the course of the performance of the contract subject may also occur in order to complete the full range of works described in the subject matter of the contract. Establishing a new location is carried out within the subject of the order, always only in the Package Redeemment Area.
7. The standardization and general principles which, in particular, the Contractor will be obliged to observe in the execution of the subject of the contract are described in paragraphs 3.2 and 3.3 of SWZ.
8. The Contracting Authority shall not reserve the obligation of the Contractor to personally perform key tasks concerning the subject of the contract. The Contractor may entrust the execution of elements (parts) of the object of the contract to subcontractors In the event of an intention to perform the subject of a contract involving subcontractors, the contractor shall indicate in his tender the parts of the contract (tangible ranges) the execution of which he intends to entrust to subcontractors and the names of possible subcontractors if they are already known.
Forest development services in the first half of the year in Forestry Futory1. The subject of the contract is services in the field of forest management as defined in Article 6 (1) (1) of the Act of 28 September 1991 on forests (text one: Journal of Laws of 2021 item 1275 as late as “Forests Act”) covering works in the field of: breeding and forest conservation, protection of the forest fire protection and tree-trees.
2. The scope of the subject matter of the contract shall include the total quantities of work indicated in point 1 resulting from Annex 3 to the SWZ, which consists of:
Annex 3.1.12 — size of works by activity groups, activities and location;
3. The kind ranges compiled in Annex No 3.1.12 are estimated
4. A detailed description of the standard of technology for carrying out individual forestry works (activities) included in the subject of the contract is contained in Annexes No 4.1-4.2 to SWZ (Description of the standard of technology for the implementation of forestry works).
5. Descriptions of the activity codes describing the individual forestry works (activities) included in the subject of the contract and the procedures for taking up are described in Annexes No 4.1 — 4.2 to SWZ
6. Due to the actual natural weather situation that may occur during the execution of the subject of the contract, as well as the economic and economic situation unforeseen at the moment, the Contracting Authority reserves the right to make reductive adjustments, enhancement adjustments, new arrangements location, as well as pausing the steps indicated in each line of tables describing the subject of the order. Increasing adjustments do not imply the introduction of new works, not covered by the scope of the contract, and reductive adjustments do not imply a complete abandonment of part They should be understood as increasing the amount of work in one location (forest address) in the Package Implementation Area (including locations in the Package Implementation Area not pre-indicated in the SWZ), while reducing the amount of work in another location (forest address) on Package Implementation Area, within the total quantities of individual work falling within the scope of the Contract Subject as defined in the SWZ, to be carried out throughout the Package Implementation Area. The need to increase the size of certain elements of the procurement in the course of the performance of the contract subject may also occur in order to complete the full range of works described in the subject matter of the contract. Establishing a new location is carried out within the subject of the order, always only in the Package Redeemment Area.
7. The standardization and general principles which, in particular, the Contractor will be obliged to observe in the execution of the subject of the contract are described in paragraphs 3.2 and 3.3 of SWZ.
8. The Contracting Authority shall not reserve the obligation of the Contractor to personally perform key tasks concerning the subject of the contract. The Contractor may entrust the execution of elements (parts) of the object of the contract to subcontractors In the event of an intention to perform the subject of a contract involving subcontractors, the contractor shall indicate in his tender the parts of the contract (tangible ranges) the execution of which he intends to entrust to subcontractors and the names of possible subcontractors if they are already known.
Forest development services in the first half of the year in Forestry Zabiała1. The subject of the contract is services in the field of forest management as defined in Article 6 (1) (1) of the Act of 28 September 1991 on forests (text one: Journal of Laws of 2021 item 1275 as late as “Forests Act”) covering works in the field of: breeding and forest conservation, protection of the forest fire protection and tree-trees.
2. The scope of the subject matter of the contract shall include the total quantities of work indicated in point 1 resulting from Annex 3 to the SWZ, which consists of:
Annex No 3.1.13 — size of works by activity groups, activities and location;
3. The kind ranges collated in Annex 3.1.13 are estimated
4. A detailed description of the standard of technology for carrying out individual forestry works (activities) included in the subject of the contract is contained in Annexes No 4.1-4.2 to SWZ (Description of the standard of technology for the implementation of forestry works).
5. Descriptions of the activity codes describing the individual forestry works (activities) included in the subject of the contract and the procedures for taking up are described in Annexes No 4.1 — 4.2 to SWZ
6. Due to the actual natural weather situation that may occur during the execution of the subject of the contract, as well as the economic and economic situation unforeseen at the moment, the Contracting Authority reserves the right to make reductive adjustments, enhancement adjustments, new arrangements location, as well as pausing the steps indicated in each line of tables describing the subject of the order. Increasing adjustments do not imply the introduction of new works, not covered by the scope of the contract, and reductive adjustments do not imply a complete abandonment of part They should be understood as increasing the amount of work in one location (forest address) in the Package Implementation Area (including locations in the Package Implementation Area not pre-indicated in the SWZ), while reducing the amount of work in another location (forest address) on Package Implementation Area, within the total quantities of individual work falling within the scope of the Contract Subject as defined in the SWZ, to be carried out throughout the Package Implementation Area. The need to increase the size of certain elements of the procurement in the course of the performance of the contract subject may also occur in order to complete the full range of works described in the subject matter of the contract. Establishing a new location is carried out within the subject of the order, always only in the Package Redeemment Area.
7. The standardization and general principles which, in particular, the Contractor will be obliged to observe in the execution of the subject of the contract are described in paragraphs 3.2 and 3.3 of SWZ.
8. The Contracting Authority shall not reserve the obligation of the Contractor to personally perform key tasks concerning the subject of the contract. The Contractor may entrust the execution of elements (parts) of the object of the contract to subcontractors In the event of an intention to perform the subject of a contract involving subcontractors, the contractor shall indicate in his tender the parts of the contract (tangible ranges) the execution of which he intends to entrust to subcontractors and the names of possible subcontractors if they are already known.
Services in the field of forest development in the first half of the year in Forestry Stare Sioło1. The subject of the contract is services in the field of forest management as defined in Article 6 (1) (1) of the Act of 28 September 1991 on forests (text one: Journal of Laws of 2021 item 1275 as late as “Forests Act”) covering works in the field of: breeding and forest conservation, protection of the forest fire protection and tree-trees.
2. The scope of the subject matter of the contract shall include the total quantities of work indicated in point 1 resulting from Annex 3 to the SWZ, which consists of:
Annex No 3.1.14 — size of works by activity groups, activities and location;
3. The kind ranges compiled in Annex No 3.1.14 are estimated
4. A detailed description of the standard of technology for carrying out individual forestry works (activities) included in the subject of the contract is contained in Annexes No 4.1-4.2 to SWZ (Description of the standard of technology for the implementation of forestry works).
5. Descriptions of the activity codes describing the individual forestry works (activities) included in the subject of the contract and the procedures for taking up are described in Annexes No 4.1 — 4.2 to SWZ
6. Due to the actual natural weather situation that may occur during the execution of the subject of the contract, as well as the economic and economic situation unforeseen at the moment, the Contracting Authority reserves the right to make reductive adjustments, enhancement adjustments, new arrangements location, as well as pausing the steps indicated in each line of tables describing the subject of the order. Increasing adjustments do not imply the introduction of new works, not covered by the scope of the contract, and reductive adjustments do not imply a complete abandonment of part They should be understood as increasing the amount of work in one location (forest address) in the Package Implementation Area (including locations in the Package Implementation Area not pre-indicated in the SWZ), while reducing the amount of work in another location (forest address) on Package Implementation Area, within the total quantities of individual work falling within the scope of the Contract Subject as defined in the SWZ, to be carried out throughout the Package Implementation Area. The need to increase the size of certain elements of the procurement in the course of the performance of the contract subject may also occur in order to complete the full range of works described in the subject matter of the contract. Establishing a new location is carried out within the subject of the order, always only in the Package Redeemment Area.
7. The standardization and general principles which, in particular, the Contractor will be obliged to observe in the execution of the subject of the contract are described in paragraphs 3.2 and 3.3 of SWZ.
8. The Contracting Authority shall not reserve the obligation of the Contractor to personally perform key tasks concerning the subject of the contract. The Contractor may entrust the execution of elements (parts) of the object of the contract to subcontractors In the event of an intention to perform the subject of a contract involving subcontractors, the contractor shall indicate in his tender the parts of the contract (tangible ranges) the execution of which he intends to entrust to subcontractors and the names of possible subcontractors if they are already known.
Services in the field of forest development in the first half of the year in Forestry Miłków1. The subject of the contract is services in the field of forest management as defined in Article 6 (1) (1) of the Act of 28 September 1991 on forests (text one: Journal of Laws of 2021 item 1275 as late as “Forests Act”) covering works in the field of: breeding and forest conservation, protection of the forest fire protection and tree-trees.
2. The scope of the subject matter of the contract shall include the total quantities of work indicated in point 1 resulting from Annex 3 to the SWZ, which consists of:
Annex 3.1.15 — size of works by activity groups, activities and location;
3. The kind ranges compiled in Annex No 3.1.15 are estimated
4. A detailed description of the standard of technology for carrying out individual forestry works (activities) included in the subject of the contract is contained in Annexes No 4.1-4.2 to SWZ (Description of the standard of technology for the implementation of forestry works).
5. Descriptions of the activity codes describing the individual forestry works (activities) included in the subject of the contract and the procedures for taking up are described in Annexes No 4.1 — 4.2 to SWZ
6. Due to the actual natural weather situation that may occur during the execution of the subject of the contract, as well as the economic and economic situation unforeseen at the moment, the Contracting Authority reserves the right to make reductive adjustments, enhancement adjustments, new arrangements location, as well as pausing the steps indicated in each line of tables describing the subject of the order. Increasing adjustments do not imply the introduction of new works, not covered by the scope of the contract, and reductive adjustments do not imply a complete abandonment of part They should be understood as increasing the amount of work in one location (forest address) in the Package Implementation Area (including locations in the Package Implementation Area not pre-indicated in the SWZ), while reducing the amount of work in another location (forest address) on Package Implementation Area, within the total quantities of individual work falling within the scope of the Contract Subject as defined in the SWZ, to be carried out throughout the Package Implementation Area. The need to increase the size of certain elements of the procurement in the course of the performance of the contract subject may also occur in order to complete the full range of works described in the subject matter of the contract. Establishing a new location is carried out within the subject of the order, always only in the Package Redeemment Area.
7. The standardization and general principles which, in particular, the Contractor will be obliged to observe in the execution of the subject of the contract are described in paragraphs 3.2 and 3.3 of SWZ.
8. The Contracting Authority shall not reserve the obligation of the Contractor to personally perform key tasks concerning the subject of the contract. The Contractor may entrust the execution of elements (parts) of the object of the contract to subcontractors In the event of an intention to perform the subject of a contract involving subcontractors, the contractor shall indicate in his tender the parts of the contract (tangible ranges) the execution of which he intends to entrust to subcontractors and the names of possible subcontractors if they are already known.
Services in the field of forest development in the first half of the year in Forestry Czerniakowa Buda1. The subject of the contract is services in the field of forest management as defined in Article 6 (1) (1) of the Act of 28 September 1991 on forests (text one: Journal of Laws of 2021 item 1275 as late as “Forests Act”) covering works in the field of: breeding and forest conservation, protection of the forest fire protection and tree-trees.
2. The scope of the subject matter of the contract shall include the total quantities of work indicated in point 1 resulting from Annex 3 to the SWZ, which consists of:
Annex No 3.1.16 — size of works by activity groups, activities and location;
3. The kind ranges compiled in Annex No 3.1.16 are estimated
4. A detailed description of the standard of technology for carrying out individual forestry works (activities) included in the subject of the contract is contained in Annexes No 4.1-4.2 to SWZ (Description of the standard of technology for the implementation of forestry works).
5. Descriptions of the activity codes describing the individual forestry works (activities) included in the subject of the contract and the procedures for taking up are described in Annexes No 4.1 — 4.2 to SWZ
6. Due to the actual natural weather situation that may occur during the execution of the subject of the contract, as well as the economic and economic situation unforeseen at the moment, the Contracting Authority reserves the right to make reductive adjustments, enhancement adjustments, new arrangements location, as well as pausing the steps indicated in each line of tables describing the subject of the order. Increasing adjustments do not imply the introduction of new works, not covered by the scope of the contract, and reductive adjustments do not imply a complete abandonment of part They should be understood as increasing the amount of work in one location (forest address) in the Package Implementation Area (including locations in the Package Implementation Area not pre-indicated in the SWZ), while reducing the amount of work in another location (forest address) on Package Implementation Area, within the total quantities of individual work falling within the scope of the Contract Subject as defined in the SWZ, to be carried out throughout the Package Implementation Area. The need to increase the size of certain elements of the procurement in the course of the performance of the contract subject may also occur in order to complete the full range of works described in the subject matter of the contract. Establishing a new location is carried out within the subject of the order, always only in the Package Redeemment Area.
7. The standardization and general principles which, in particular, the Contractor will be obliged to observe in the execution of the subject of the contract are described in paragraphs 3.2 and 3.3 of SWZ.
8. The Contracting Authority shall not reserve the obligation of the Contractor to personally perform key tasks concerning the subject of the contract. The Contractor may entrust the execution of elements (parts) of the object of the contract to subcontractors In the event of an intention to perform the subject of a contract involving subcontractors, the contractor shall indicate in his tender the parts of the contract (tangible ranges) the execution of which he intends to entrust to subcontractors and the names of possible subcontractors if they are already known.
Services in the field of forest development in the first half of the year in Forestry Sucha Wola1. The subject of the contract is services in the field of forest management as defined in Article 6 (1) (1) of the Act of 28 September 1991 on forests (text one: Journal of Laws of 2021 item 1275 as late as “Forests Act”) covering works in the field of: breeding and forest conservation, protection of the forest fire protection and tree-trees.
2. The scope of the subject matter of the contract shall include the total quantities of work indicated in point 1 resulting from Annex 3 to the SWZ, which consists of:
Annex No 3.1.17 — size of works by activity groups, activities and location;
3. The kind ranges compiled in Annex No 3.1.17 are estimated
4. A detailed description of the standard of technology for carrying out individual forestry works (activities) included in the subject of the contract is contained in Annexes No 4.1-4.2 to SWZ (Description of the standard of technology for the implementation of forestry works).
5. Descriptions of the activity codes describing the individual forestry works (activities) included in the subject of the contract and the procedures for taking up are described in Annexes No 4.1 — 4.2 to SWZ
6. Due to the actual natural weather situation that may occur during the execution of the subject of the contract, as well as the economic and economic situation unforeseen at the moment, the Contracting Authority reserves the right to make reductive adjustments, enhancement adjustments, new arrangements location, as well as pausing the steps indicated in each line of tables describing the subject of the order. Increasing adjustments do not imply the introduction of new works, not covered by the scope of the contract, and reductive adjustments do not imply a complete abandonment of part They should be understood as increasing the amount of work in one location (forest address) in the Package Implementation Area (including locations in the Package Implementation Area not pre-indicated in the SWZ), while reducing the amount of work in another location (forest address) on Package Implementation Area, within the total quantities of individual work falling within the scope of the Contract Subject as defined in the SWZ, to be carried out throughout the Package Implementation Area. The need to increase the size of certain elements of the procurement in the course of the performance of the contract subject may also occur in order to complete the full range of works described in the subject matter of the contract. Establishing a new location is carried out within the subject of the order, always only in the Package Redeemment Area.
7. The standardization and general principles which, in particular, the Contractor will be obliged to observe in the execution of the subject of the contract are described in paragraphs 3.2 and 3.3 of SWZ.
8. The Contracting Authority shall not reserve the obligation of the Contractor to personally perform key tasks concerning the subject of the contract. The Contractor may entrust the execution of elements (parts) of the object of the contract to subcontractors In the event of an intention to perform the subject of a contract involving subcontractors, the contractor shall indicate in his tender the parts of the contract (tangible ranges) the execution of which he intends to entrust to subcontractors and the names of possible subcontractors if they are already known.
Services in the field of forest development in the first half of the year in Lipina Forestry1. The subject of the contract is services in the field of forest management as defined in Article 6 (1) (1) of the Act of 28 September 1991 on forests (text one: Journal of Laws of 2021 item 1275 as late as “Forests Act”) covering works in the field of: breeding and forest conservation, protection of the forest fire protection and tree-trees.
2. The scope of the subject matter of the contract shall include the total quantities of work indicated in point 1 resulting from Annex 3 to the SWZ, which consists of:
Annex No 3.1.18 — size of works by activity groups, activities and location;
3. The kind ranges compiled in Annex No 3.1.18 are estimated
4. A detailed description of the standard of technology for carrying out individual forestry works (activities) included in the subject of the contract is contained in Annexes No 4.1-4.2 to SWZ (Description of the standard of technology for the implementation of forestry works).
5. Descriptions of the activity codes describing the individual forestry works (activities) included in the subject of the contract and the procedures for taking up are described in Annexes No 4.1 — 4.2 to SWZ
6. Due to the actual natural weather situation that may occur during the execution of the subject of the contract, as well as the economic and economic situation unforeseen at the moment, the Contracting Authority reserves the right to make reductive adjustments, enhancement adjustments, new arrangements location, as well as pausing the steps indicated in each line of tables describing the subject of the order. Increasing adjustments do not imply the introduction of new works, not covered by the scope of the contract, and reductive adjustments do not imply a complete abandonment of part They should be understood as increasing the amount of work in one location (forest address) in the Package Implementation Area (including locations in the Package Implementation Area not pre-indicated in the SWZ), while reducing the amount of work in another location (forest address) on Package Implementation Area, within the total quantities of individual work falling within the scope of the Contract Subject as defined in the SWZ, to be carried out throughout the Package Implementation Area. The need to increase the size of certain elements of the procurement in the course of the performance of the contract subject may also occur in order to complete the full range of works described in the subject matter of the contract. Establishing a new location is carried out within the subject of the order, always only in the Package Redeemment Area.
7. The standardization and general principles which, in particular, the Contractor will be obliged to observe in the execution of the subject of the contract are described in paragraphs 3.2 and 3.3 of SWZ.
8. The Contracting Authority shall not reserve the obligation of the Contractor to personally perform key tasks concerning the subject of the contract. The Contractor may entrust the execution of elements (parts) of the object of the contract to subcontractors In the event of an intention to perform the subject of a contract involving subcontractors, the contractor shall indicate in his tender the parts of the contract (tangible ranges) the execution of which he intends to entrust to subcontractors and the names of possible subcontractors if they are already known.
Services in the field of logging and plucking in Forestry Futory1. The subject of the contract is services in the field of forest management as defined in Article 6 (1) point 1 of the Act of 28 September 1991 on forests (text one: Journal of Laws of 2021, item 1275, as late as “Forests Act”) covering works in the field of logging and logging.
2. The scope of the object of the contract shall include the summary quantities of work indicated in point 1 resulting from Annex 3 to the SWZ, which shall consist of:
Annex No 3.1.2 — work size by group of activities, activities and location;
Annex 3.2. — a statement of the distance and conditions of timber breaking;
Annex 3.3. — information on the use of possible logging technologies;
3. The kind ranges compiled in Annexes No 3.1. - 3.3. are estimated
4. A detailed description of the standard of technology for the performance of individual forestry works (activities) included in the subject of the contract is set out in Annex 4.3 to SWZ (Description of the standard of technology for the implementation of forestry works).
5. Descriptions of the activity codes describing the individual forestry works (activities) included in the subject of the contract and the procedure for taking up are described in Annex No 4.3 to SWZ
6. Due to the actual natural weather situation that may occur during the execution of the subject of the contract, as well as the economic and economic situation unforeseen at the moment, the Contracting Authority reserves the right to make reductive adjustments, enhancement adjustments, new arrangements location, as well as pausing the steps indicated in each line of tables describing the subject of the order. Increasing adjustments do not imply the introduction of new works, not covered by the scope of the contract, and reductive adjustments do not imply a complete abandonment of part They should be understood as increasing the amount of work in one location (forest address) in the Package Implementation Area (including locations in the Package Implementation Area not pre-indicated in the SWZ), while reducing the amount of work in another location (forest address) on Package Implementation Area, within the total quantities of individual work falling within the scope of the Contract Subject as defined in the SWZ, to be carried out throughout the Package Implementation Area. The need to increase the size of certain elements of the procurement in the course of the performance of the contract subject may also occur in order to complete the full range of works described in the subject matter of the contract. Establishing a new location is carried out within the subject of the order, always only in the Package Redeemment Area.
7. The standardization and general principles which, in particular, the Contractor will be obliged to observe in the execution of the subject of the contract are described in paragraphs 3.2 and 3.3 of SWZ.
8. The Contracting Authority shall not reserve the obligation of the Contractor to personally perform key tasks concerning the subject of the contract. The Contractor may entrust the execution of elements (parts) of the object of the contract to subcontractors In the event of an intention to perform the subject of a contract involving subcontractors, the contractor shall indicate in his tender the parts of the contract (tangible ranges) the execution of which he intends to entrust to subcontractors and the names of possible subcontractors if they are already known.
9. The Contracting Authority in accordance with Article 95 of the PZP requires employment by the Contractor or subcontractor on the basis of the working relationship of persons performing the performance of the contract involving the acquisition and retraction of the wood material, if the performance of these activities consists in the performance of the work in the manner of referred to in Article 22 (1) of the Act of 26 June 1974 - Labour Code (text: Journal of Laws of 2020 item 1320 as amended).
Services in the field of logging and ripping of timber in Forestry Zabiała1. The subject of the contract is services in the field of forest management as defined in Article 6 (1) point 1 of the Act of 28 September 1991 on forests (text one: Journal of Laws of 2021, item 1275, as late as “Forests Act”) covering works in the field of logging and logging.
2. The scope of the object of the contract shall include the summary quantities of work indicated in point 1 resulting from Annex 3 to the SWZ, which shall consist of:
Annex 3.1.3 — work size by group of activities, activities and location;
Annex 3.2. — a statement of the distance and conditions of timber breaking;
Annex 3.3. — information on the use of possible logging technologies;
3. The kind ranges compiled in Annexes No 3.1. - 3.3. are estimated
4. A detailed description of the standard of technology for the performance of individual forestry works (activities) included in the subject of the contract is set out in Annex 4.3 to SWZ (Description of the standard of technology for the implementation of forestry works).
5. Descriptions of the activity codes describing the individual forestry works (activities) included in the subject of the contract and the procedure for taking up are described in Annex No 4.3 to SWZ
6. Due to the actual natural weather situation that may occur during the execution of the subject of the contract, as well as the economic and economic situation unforeseen at the moment, the Contracting Authority reserves the right to make reductive adjustments, enhancement adjustments, new arrangements location, as well as pausing the steps indicated in each line of tables describing the subject of the order. Increasing adjustments do not imply the introduction of new works, not covered by the scope of the contract, and reductive adjustments do not imply a complete abandonment of part They should be understood as increasing the amount of work in one location (forest address) in the Package Implementation Area (including locations in the Package Implementation Area not pre-indicated in the SWZ), while reducing the amount of work in another location (forest address) on Package Implementation Area, within the total quantities of individual work falling within the scope of the Contract Subject as defined in the SWZ, to be carried out throughout the Package Implementation Area. The need to increase the size of certain elements of the procurement in the course of the performance of the contract subject may also occur in order to complete the full range of works described in the subject matter of the contract. Establishing a new location is carried out within the subject of the order, always only in the Package Redeemment Area.
7. The standardization and general principles which, in particular, the Contractor will be obliged to observe in the execution of the subject of the contract are described in paragraphs 3.2 and 3.3 of SWZ.
8. The Contracting Authority shall not reserve the obligation of the Contractor to personally perform key tasks concerning the subject of the contract. The Contractor may entrust the execution of elements (parts) of the object of the contract to subcontractors In the event of an intention to perform the subject of a contract involving subcontractors, the contractor shall indicate in his tender the parts of the contract (tangible ranges) the execution of which he intends to entrust to subcontractors and the names of possible subcontractors if they are already known.
9. The Contracting Authority in accordance with Article 95 of the PZP requires employment by the Contractor or subcontractor on the basis of the working relationship of persons performing the performance of the contract involving the acquisition and retraction of the wood material, if the performance of these activities consists in the performance of the work in the manner of referred to in Article 22 (1) of the Act of 26 June 1974 - Labour Code (text: Journal of Laws of 2020 item 1320 as amended).
Services in the field of timber harvesting and plucking in Forestry Stare Sioło1. The subject of the contract is services in the field of forest management as defined in Article 6 (1) point 1 of the Act of 28 September 1991 on forests (text one: Journal of Laws of 2021, item 1275, as late as “Forests Act”) covering works in the field of logging and logging.
2. The scope of the object of the contract shall include the summary quantities of work indicated in point 1 resulting from Annex 3 to the SWZ, which shall consist of:
Annex No 3.1.4 — work size by group of activities, activities and location;
Annex 3.2. — a statement of the distance and conditions of timber breaking;
Annex 3.3. — information on the use of possible logging technologies;
3. The kind ranges compiled in Annexes No 3.1. - 3.3. are estimated
4. A detailed description of the standard of technology for the performance of individual forestry works (activities) included in the subject of the contract is set out in Annex 4.3 to SWZ (Description of the standard of technology for the implementation of forestry works).
5. Descriptions of the activity codes describing the individual forestry works (activities) included in the subject of the contract and the procedure for taking up are described in Annex No 4.3 to SWZ
6. Due to the actual natural weather situation that may occur during the execution of the subject of the contract, as well as the economic and economic situation unforeseen at the moment, the Contracting Authority reserves the right to make reductive adjustments, enhancement adjustments, new arrangements location, as well as pausing the steps indicated in each line of tables describing the subject of the order. Increasing adjustments do not imply the introduction of new works, not covered by the scope of the contract, and reductive adjustments do not imply a complete abandonment of part They should be understood as increasing the amount of work in one location (forest address) in the Package Implementation Area (including locations in the Package Implementation Area not pre-indicated in the SWZ), while reducing the amount of work in another location (forest address) on Package Implementation Area, within the total quantities of individual work falling within the scope of the Contract Subject as defined in the SWZ, to be carried out throughout the Package Implementation Area. The need to increase the size of certain elements of the procurement in the course of the performance of the contract subject may also occur in order to complete the full range of works described in the subject matter of the contract. Establishing a new location is carried out within the subject of the order, always only in the Package Redeemment Area.
7. The standardization and general principles which, in particular, the Contractor will be obliged to observe in the execution of the subject of the contract are described in paragraphs 3.2 and 3.3 of SWZ.
8. The Contracting Authority shall not reserve the obligation of the Contractor to personally perform key tasks concerning the subject of the contract. The Contractor may entrust the execution of elements (parts) of the object of the contract to subcontractors In the event of an intention to perform the subject of a contract involving subcontractors, the contractor shall indicate in his tender the parts of the contract (tangible ranges) the execution of which he intends to entrust to subcontractors and the names of possible subcontractors if they are already known.
9. The Contracting Authority in accordance with Article 95 of the PZP requires employment by the Contractor or subcontractor on the basis of the working relationship of persons performing the performance of the contract involving the acquisition and retraction of the wood material, if the performance of these activities consists in the performance of the work in the manner of referred to in Article 22 (1) of the Act of 26 June 1974 - Labour Code (text: Journal of Laws of 2020 item 1320 as amended).
Services in the field of logging and plucking in the Forestry of Miłków1. The subject of the contract is services in the field of forest management as defined in Article 6 (1) point 1 of the Act of 28 September 1991 on forests (text one: Journal of Laws of 2021, item 1275, as late as “Forests Act”) covering works in the field of logging and logging.
2. The scope of the object of the contract shall include the summary quantities of work indicated in point 1 resulting from Annex 3 to the SWZ, which shall consist of:
Annex No 3.1.5 — work size by group of activities, activities and location;
Annex 3.2. — a statement of the distance and conditions of timber breaking;
Annex 3.3. — information on the use of possible logging technologies;
3. The kind ranges compiled in Annexes No 3.1. - 3.3. are estimated
4. A detailed description of the standard of technology for the performance of individual forestry works (activities) included in the subject of the contract is set out in Annex 4.3 to SWZ (Description of the standard of technology for the implementation of forestry works).
5. Descriptions of the activity codes describing the individual forestry works (activities) included in the subject of the contract and the procedure for taking up are described in Annex No 4.3 to SWZ
6. Due to the actual natural weather situation that may occur during the execution of the subject of the contract, as well as the economic and economic situation unforeseen at the moment, the Contracting Authority reserves the right to make reductive adjustments, enhancement adjustments, new arrangements location, as well as pausing the steps indicated in each line of tables describing the subject of the order. Increasing adjustments do not imply the introduction of new works, not covered by the scope of the contract, and reductive adjustments do not imply a complete abandonment of part They should be understood as increasing the amount of work in one location (forest address) in the Package Implementation Area (including locations in the Package Implementation Area not pre-indicated in the SWZ), while reducing the amount of work in another location (forest address) on Package Implementation Area, within the total quantities of individual work falling within the scope of the Contract Subject as defined in the SWZ, to be carried out throughout the Package Implementation Area. The need to increase the size of certain elements of the procurement in the course of the performance of the contract subject may also occur in order to complete the full range of works described in the subject matter of the contract. Establishing a new location is carried out within the subject of the order, always only in the Package Redeemment Area.
7. The standardization and general principles which, in particular, the Contractor will be obliged to observe in the execution of the subject of the contract are described in paragraphs 3.2 and 3.3 of SWZ.
8. The Contracting Authority shall not reserve the obligation of the Contractor to personally perform key tasks concerning the subject of the contract. The Contractor may entrust the execution of elements (parts) of the object of the contract to subcontractors In the event of an intention to perform the subject of a contract involving subcontractors, the contractor shall indicate in his tender the parts of the contract (tangible ranges) the execution of which he intends to entrust to subcontractors and the names of possible subcontractors if they are already known.
9. The Contracting Authority in accordance with Article 95 of the PZP requires employment by the Contractor or subcontractor on the basis of the working relationship of persons performing the performance of the contract involving the acquisition and retraction of the wood material, if the performance of these activities consists in the performance of the work in the manner of referred to in Article 22 (1) of the Act of 26 June 1974 - Labour Code (text: Journal of Laws of 2020 item 1320 as amended).
Services in the field of logging and plucking in Forestry Czerniakowa Buda1. The subject of the contract is services in the field of forest management as defined in Article 6 (1) point 1 of the Act of 28 September 1991 on forests (text one: Journal of Laws of 2021, item 1275, as late as “Forests Act”) covering works in the field of logging and logging.
2. The scope of the object of the contract shall include the summary quantities of work indicated in point 1 resulting from Annex 3 to the SWZ, which shall consist of:
Annex No 3.1.6 — work size by group of activities, activities and location;
Annex 3.2. — a statement of the distance and conditions of timber breaking;
Annex 3.3. — information on the use of possible logging technologies;
3. The kind ranges compiled in Annexes No 3.1. - 3.3. are estimated
4. A detailed description of the standard of technology for the performance of individual forestry works (activities) included in the subject of the contract is set out in Annex 4.3 to SWZ (Description of the standard of technology for the implementation of forestry works).
5. Descriptions of the activity codes describing the individual forestry works (activities) included in the subject of the contract and the procedure for taking up are described in Annex No 4.3 to SWZ
6. Due to the actual natural weather situation that may occur during the execution of the subject of the contract, as well as the economic and economic situation unforeseen at the moment, the Contracting Authority reserves the right to make reductive adjustments, enhancement adjustments, new arrangements location, as well as pausing the steps indicated in each line of tables describing the subject of the order. Increasing adjustments do not imply the introduction of new works, not covered by the scope of the contract, and reductive adjustments do not imply a complete abandonment of part They should be understood as increasing the amount of work in one location (forest address) in the Package Implementation Area (including locations in the Package Implementation Area not pre-indicated in the SWZ), while reducing the amount of work in another location (forest address) on Package Implementation Area, within the total quantities of individual work falling within the scope of the Contract Subject as defined in the SWZ, to be carried out throughout the Package Implementation Area. The need to increase the size of certain elements of the procurement in the course of the performance of the contract subject may also occur in order to complete the full range of works described in the subject matter of the contract. Establishing a new location is carried out within the subject of the order, always only in the Package Redeemment Area.
7. The standardization and general principles which, in particular, the Contractor will be obliged to observe in the execution of the subject of the contract are described in paragraphs 3.2 and 3.3 of SWZ.
8. The Contracting Authority shall not reserve the obligation of the Contractor to personally perform key tasks concerning the subject of the contract. The Contractor may entrust the execution of elements (parts) of the object of the contract to subcontractors In the event of an intention to perform the subject of a contract involving subcontractors, the contractor shall indicate in his tender the parts of the contract (tangible ranges) the execution of which he intends to entrust to subcontractors and the names of possible subcontractors if they are already known.
9. The Contracting Authority in accordance with Article 95 of the PZP requires employment by the Contractor or subcontractor on the basis of the working relationship of persons performing the performance of the contract involving the acquisition and retraction of the wood material, if the performance of these activities consists in the performance of the work in the manner of referred to in Article 22 (1) of the Act of 26 June 1974 - Labour Code (text: Journal of Laws of 2020 item 1320 as amended).
Services in the field of timber harvesting and plucking in Forestry Sucha Wola1. The subject of the contract is services in the field of forest management as defined in Article 6 (1) point 1 of the Act of 28 September 1991 on forests (text one: Journal of Laws of 2021, item 1275, as late as “Forests Act”) covering works in the field of logging and logging.
2. The scope of the object of the contract shall include the summary quantities of work indicated in point 1 resulting from Annex 3 to the SWZ, which shall consist of:
Annex No 3.1.7 — work size by group of activities, activities and location;
Annex 3.2. — a statement of the distance and conditions of timber breaking;
Annex 3.3. — information on the use of possible logging technologies;
3. The kind ranges compiled in Annexes No 3.1. - 3.3. are estimated
4. A detailed description of the standard of technology for the performance of individual forestry works (activities) included in the subject of the contract is set out in Annex 4.3 to SWZ (Description of the standard of technology for the implementation of forestry works).
5. Descriptions of the activity codes describing the individual forestry works (activities) included in the subject of the contract and the procedure for taking up are described in Annex No 4.3 to SWZ
6. Due to the actual natural weather situation that may occur during the execution of the subject of the contract, as well as the economic and economic situation unforeseen at the moment, the Contracting Authority reserves the right to make reductive adjustments, enhancement adjustments, new arrangements location, as well as pausing the steps indicated in each line of tables describing the subject of the order. Increasing adjustments do not imply the introduction of new works, not covered by the scope of the contract, and reductive adjustments do not imply a complete abandonment of part They should be understood as increasing the amount of work in one location (forest address) in the Package Implementation Area (including locations in the Package Implementation Area not pre-indicated in the SWZ), while reducing the amount of work in another location (forest address) on Package Implementation Area, within the total quantities of individual work falling within the scope of the Contract Subject as defined in the SWZ, to be carried out throughout the Package Implementation Area. The need to increase the size of certain elements of the procurement in the course of the performance of the contract subject may also occur in order to complete the full range of works described in the subject matter of the contract. Establishing a new location is carried out within the subject of the order, always only in the Package Redeemment Area.
7. The standardization and general principles which, in particular, the Contractor will be obliged to observe in the execution of the subject of the contract are described in paragraphs 3.2 and 3.3 of SWZ.
8. The Contracting Authority shall not reserve the obligation of the Contractor to personally perform key tasks concerning the subject of the contract. The Contractor may entrust the execution of elements (parts) of the object of the contract to subcontractors In the event of an intention to perform the subject of a contract involving subcontractors, the contractor shall indicate in his tender the parts of the contract (tangible ranges) the execution of which he intends to entrust to subcontractors and the names of possible subcontractors if they are already known.
9. The Contracting Authority in accordance with Article 95 of the PZP requires employment by the Contractor or subcontractor on the basis of the working relationship of persons performing the performance of the contract involving the acquisition and retraction of the wood material, if the performance of these activities consists in the performance of the work in the manner of referred to in Article 22 (1) of the Act of 26 June 1974 - Labour Code (text: Journal of Laws of 2020 item 1320 as amended).
Services in the field of logging and ripping of timber in Lipina Forestry1. The subject of the contract is services in the field of forest management as defined in Article 6 (1) point 1 of the Act of 28 September 1991 on forests (text one: Journal of Laws of 2021, item 1275, as late as “Forests Act”) covering works in the field of logging and logging.
2. The scope of the object of the contract shall include the summary quantities of work indicated in point 1 resulting from Annex 3 to the SWZ, which shall consist of:
Annex No 3.1.8 — work size by group of activities, activities and location;
Annex 3.2. — a statement of the distance and conditions of timber breaking;
Annex 3.3. — information on the use of possible logging technologies;
3. The kind ranges compiled in Annexes No 3.1. - 3.3. are estimated
4. A detailed description of the standard of technology for the performance of individual forestry works (activities) included in the subject of the contract is set out in Annex 4.3 to SWZ (Description of the standard of technology for the implementation of forestry works).
5. Descriptions of the activity codes describing the individual forestry works (activities) included in the subject of the contract and the procedure for taking up are described in Annex No 4.3 to SWZ
6. Due to the actual natural weather situation that may occur during the execution of the subject of the contract, as well as the economic and economic situation unforeseen at the moment, the Contracting Authority reserves the right to make reductive adjustments, enhancement adjustments, new arrangements location, as well as pausing the steps indicated in each line of tables describing the subject of the order. Increasing adjustments do not imply the introduction of new works, not covered by the scope of the contract, and reductive adjustments do not imply a complete abandonment of part They should be understood as increasing the amount of work in one location (forest address) in the Package Implementation Area (including locations in the Package Implementation Area not pre-indicated in the SWZ), while reducing the amount of work in another location (forest address) on Package Implementation Area, within the total quantities of individual work falling within the scope of the Contract Subject as defined in the SWZ, to be carried out throughout the Package Implementation Area. The need to increase the size of certain elements of the procurement in the course of the performance of the contract subject may also occur in order to complete the full range of works described in the subject matter of the contract. Establishing a new location is carried out within the subject of the order, always only in the Package Redeemment Area.
7. The standardization and general principles which, in particular, the Contractor will be obliged to observe in the execution of the subject of the contract are described in paragraphs 3.2 and 3.3 of SWZ.
8. The Contracting Authority shall not reserve the obligation of the Contractor to personally perform key tasks concerning the subject of the contract. The Contractor may entrust the execution of elements (parts) of the object of the contract to subcontractors In the event of an intention to perform the subject of a contract involving subcontractors, the contractor shall indicate in his tender the parts of the contract (tangible ranges) the execution of which he intends to entrust to subcontractors and the names of possible subcontractors if they are already known.
9. The Contracting Authority in accordance with Article 95 of the PZP requires employment by the Contractor or subcontractor on the basis of the working relationship of persons performing the performance of the contract involving the acquisition and retraction of the wood material, if the performance of these activities consists in the performance of the work in the manner of referred to in Article 22 (1) of the Act of 26 June 1974 - Labour Code (text: Journal of Laws of 2020 item 1320 as amended).
Forest management services in Forestry Cologne1. The subject of the contract is forest management services as defined in Article 6 (1) of the Act of 28 September 1991 on forests (text: Journal of Laws of 2021, item 1275, of late. — “Act on Forests”) covering work in the fields of: farming and forest protection, fire protection, harvesting and breaking timber, forest seed, selection of forest trees, forest nursery.
2. The scope of the object of the contract shall include the summary quantities of work indicated in point 1 resulting from Annex 3 to the SWZ, which shall consist of:
Annex 3.1.9 — size of works by activity groups, activities and location;
Annex 3.2. — a statement of the distance and conditions of timber breaking;
Annex 3.3. — information on the use of possible logging technologies;
3. The kind ranges compiled in Annexes No 3.1.-3.3. are estimated
4. A detailed description of the standard of technology for carrying out individual forestry works (activities) included in Annexes 4.1 to 4.4 to SWZ (Description of the standard of forest work implementation technology).
5. Descriptions of activity codes describing individual forestry works (activities) included in the subject of the contract and the procedure for receiving are described in Annexes 4.1 to 4.4 to SWZ
6. Due to the actual natural weather situation that may occur during the execution of the subject of the contract, as well as the economic and economic situation unforeseen at the moment, the Contracting Authority reserves the right to make reductive adjustments, enhancement adjustments, new arrangements location, as well as pausing the steps indicated in each line of tables describing the subject of the order. Increasing adjustments do not imply the introduction of new works, not covered by the scope of the contract, and reductive adjustments do not imply a complete abandonment of part They should be understood as increasing the amount of work in one location (forest address) in the Package Implementation Area (including locations in the Package Implementation Area not pre-indicated in the SWZ), while reducing the amount of work in another location (forest address) on Package Implementation Area, within the total quantities of individual work falling within the scope of the Contract Subject as defined in the SWZ, to be carried out throughout the Package Implementation Area. The need to increase the size of certain elements of the procurement in the course of the performance of the contract subject may also occur in order to complete the full range of works described in the subject matter of the contract. Establishing a new location is carried out within the subject of the order, always only in the Package Redeemment Area.
7. The standardization and general principles which, in particular, the Contractor will be obliged to observe in the execution of the subject of the contract are described in paragraphs 3.2 and 3.3 of SWZ.
8. The Contracting Authority shall not reserve the obligation of the Contractor to personally perform key tasks concerning the subject of the contract. The Contractor may entrust the execution of elements (parts) of the object of the contract to subcontractors In the event of an intention to perform the subject of a contract involving subcontractors, the contractor shall indicate in his tender the parts of the contract (tangible ranges) the execution of which he intends to entrust to subcontractors and the names of possible subcontractors if they are already known.
9. The Contracting Authority in accordance with Article 95 of the PZP requires employment by the Contractor or subcontractor on the basis of the working relationship of persons performing the performance of the contract involving the acquisition and retraction of the wood material, if the performance of these activities consists in the performance of the work in the manner of referred to in Article 22 (1) of the Act of 26 June 1974 - Labour Code (text: Journal of Laws of 2020 item 1320 as amended).