The 2 Gesamtvorhaben
Road construction
- Oberbodenarbeiten 150 m3
- Loosen and recycle soil 1,500 m3
- Manufacture level, 20,000 m2
- Making trenches, 660 m
- Produce seepage strands, 605 m
- Absorb layers without binder, 700 m3
- Manufacture frost protection, 2,000 m3
- Make banquet, 1,600 m
- Renew base, binder and surface course, 20,000 m2
- pick up kerbstones, 400 m
- Set curbs, 800 m
- Repair kerbstones, 3,100 m
- Make marking, 3,000 m
bridge construction
- Demolish concrete and reinforced concrete, 700 m3
- Baugrubenaushub, 2100 m3
- Baugrubenverfüllung, 2200 m3
- Trägerbohlverbau, 250 m2
- Produce unreinforced concrete, 400 m3
- Making drainage concrete, 520 m3
- Reinforced concrete foundations, 260 m3
- Reinforced concrete frame, 730 m3
- Reinforced concrete caps, 50 m3
- Waterproofing bitumen welding sheet, 580 m2
- Bauwerksbord Granite, 110 m
- Protective and surface course asphalt, 400 m2
- Füllstabgeländer, 74 m
- Embankment stairs with spar railing, 44 m
retaining wall
- Oberbodenarbeiten, 120 m3
- Baugrubenaushub, 2.300 m3
- Baugrubenverfüllung, 2.200 m3
- Installing double planks sheet piling, 700 m
- Make micropiles, length 10 to 18 m, 45 pcs
- Produce unreinforced concrete, 160 m3
- Reinforced concrete head beams, 100 m3
- Reinforced concrete wall shaft, 25 m3
- Make spar railings, 100 m