Heat pump; distribution network; wall heating
Construction phase 01
- Production of the technology center consisting of 2 heat pumps, 2 buffer storage tanks, 2
heat exchangers, a distributor and approx. 6 pumps.
- Production of the heat distribution network for the technical center.
- Installation of the heat distribution network in the underground structure on the labyrinth.
- laying the wall heating on a wall area of approx. 1200 m2
- Provision of a mobile heating system for document heating
Construction phase 02
- Installation of the heat distribution network in the underground structure at the 12-room house.
- laying the wall heating on a wall area of approx. 1200 m2
- Provision of a mobile heating system for document heating