Data exchange and SAP system adaptation _ IT implementation FlexCare
Data exchange and SAP system adaptation _ IT implementation FlexCare
With the procurement (https://www.mvbnet.de/aktuelles/flexity/) of the from 2024 in
Magdeburg expected low-floor trams NGT10D (Flexity) was a
Operator contract to carry out the maintenance work and a
Spare parts supply contract concluded with the manufacturer Alstom. With these
Contracts is the extensive automated processing of data exchange
between the tram manufacturer's SAP systems and the SAP system
of the MVB. The aim of the tender is to find an IT partner.
find the implementation of the processes in SAP R3 and the data exchange
between the Alstom MVB side.
A middleware must be used as a mapping system between the SAP systems
(workspace 1) and at the same time the SAP-side processes are in the MVB
SAP system in such a way that between the logistical and commercial
processes as well as the maintenance processes an internal automated process
is established with document flows and release status (workspace 2).
In an upstream and partly parallel project, a mobile
Maintenance solution introduced. Part of this project is so close to SAP
Standard as possible to develop the processes in SAP R3 and the mobile
Maintenance in the process. The introduction of a mobile
Maintenance is not part of this tender.
The overall performance includes two areas of work, which can be considered as technical
are put out to tender coherently and are implemented jointly
must. Coordination between the two areas of work is on offer
to be priced in. The technical requirements of the two areas of work are described in processes. At the start of the project, there is a kick-off with everyone involved in the project
stakeholders.