AG0573 - Cyclical Routine Maintenance and Associated Repairs of Foul Water Infrastructure Including Effluent Disposal 2024-2027 | Tenderlake

AG0573 - Cyclical Routine Maintenance and Associated Repairs of Foul Water Infrastructure Including Effluent Disposal 2024-2027

Contract Value:
GBP 3M -
Notice Type:
Contract Notice
Published Date:
30 September 2024
Closing Date:
01 November 2024
Location(s):
UKJ3 Hampshire and Isle of Wight (UK UNITED KINGDOM)
UKK1 Gloucestershire, Wiltshire and Bristol/Bath area (UK UNITED KINGDOM)
UKK23 Somerset (UK UNITED KINGDOM)
UKK25 Dorset (UK UNITED KINGDOM)
UKK30 Cornwall and Isles of Scilly (UK UNITED KINGDOM)
UKK4 Devon (UK UNITED KINGDOM)
Description:
Routine maintenance and emergency services are needed for foul water infrastructure assets, including sewage treatment plants and septic tanks, across multiple regions.
AG0573 - Cyclical Routine Maintenance and Associated Repairs of Foul Water Infrastructure Including Effluent Disposal 2024-2027.
Aster Group has approximately 76 foul water infrastructure assets (Sewage Treatment Plants, septic tanks and pumping stations) serving homes not connected to mains drainage. There is an ongoing requirement to undertake routine maintenance of the foul water assets to ensure correct operation and compliance with Environment Agency discharge consents along with the emptying of septic tanks to provide effluent disposal arrangements for properties served by the installations. This procurement is for the successor arrangement to the current contract which comes to an end in early 2025. The requirement is for the provision of scheduled maintenance, non-scheduled maintenance works (where instructed) and provision of a provision of 24-hour, 365-day out of hours and emergency call out service. Full details of the requirements are set out in the Procurement Documents.
Lot 1 - North Hampshire
The requirement is for the provision of the following services to sewage treatment plants, septic tank systems, pumping stations, and surface water pumps installations as set out in the procurement documents:• Scheduled maintenance - servicing of installations including the emptying and disposal of wastewater liquor and sludge.• Non-scheduled maintenance works - reactive repairs, emergency works and ad-hoc tankering (where instructed) to maintain the continuous function of the foul water infrastructure assets. • Out of hours and emergency call out service – provision of 24-hour, 365-day cover for reactive and emergency work along with ad-hoc tankering.For installations within the Lot as set out in the Procurement Documents.
Lot 2 - South Hampshire
The requirement is for the provision of the following services to sewage treatment plants, septic tank systems, pumping stations, and surface water pumps installations as set out in the procurement documents:• Scheduled maintenance - servicing of installations including the emptying and disposal of wastewater liquor and sludge.• Non-scheduled maintenance works - reactive repairs, emergency works and ad-hoc tankering (where instructed) to maintain the continuous function of the foul water infrastructure assets. • Out of hours and emergency call out service – provision of 24-hour, 365-day cover for reactive and emergency work along with ad-hoc tankering.For installations within the Lot as set out in the Procurement Documents.
Lot 3 - East Dorset
The requirement is for the provision of the following services to sewage treatment plants, septic tank systems, pumping stations, and surface water pumps installations as set out in the procurement documents:• Scheduled maintenance - servicing of installations including the emptying and disposal of wastewater liquor and sludge.• Non-scheduled maintenance works - reactive repairs, emergency works and ad-hoc tankering (where instructed) to maintain the continuous function of the foul water infrastructure assets. • Out of hours and emergency call out service – provision of 24-hour, 365-day cover for reactive and emergency work along with ad-hoc tankering.For installations within the Lot as set out in the Procurement Documents.
Lot 4 - West Dorset
The requirement is for the provision of the following services to sewage treatment plants, septic tank systems, pumping stations, and surface water pumps installations as set out in the procurement documents:• Scheduled maintenance - servicing of installations including the emptying and disposal of wastewater liquor and sludge.• Non-scheduled maintenance works - reactive repairs, emergency works and ad-hoc tankering (where instructed) to maintain the continuous function of the foul water infrastructure assets. • Out of hours and emergency call out service – provision of 24-hour, 365-day cover for reactive and emergency work along with ad-hoc tankering.For installations within the Lot as set out in the Procurement Documents.
Lot 5 - Devon & Cornwall
The requirement is for the provision of the following services to sewage treatment plants, septic tank systems, pumping stations, and surface water pumps installations as set out in the procurement documents:• Scheduled maintenance - servicing of installations including the emptying and disposal of wastewater liquor and sludge.• Non-scheduled maintenance works - reactive repairs, emergency works and ad-hoc tankering (where instructed) to maintain the continuous function of the foul water infrastructure assets. • Out of hours and emergency call out service – provision of 24-hour, 365-day cover for reactive and emergency work along with ad-hoc tankering.For installations within the Lot as set out in the Procurement Documents.
Lot 6 - Somerset
The requirement is for the provision of the following services to sewage treatment plants, septic tank systems, pumping stations, and surface water pumps installations as set out in the procurement documents:• Scheduled maintenance - servicing of installations including the emptying and disposal of wastewater liquor and sludge.• Non-scheduled maintenance works - reactive repairs, emergency works and ad-hoc tankering (where instructed) to maintain the continuous function of the foul water infrastructure assets. • Out of hours and emergency call out service – provision of 24-hour, 365-day cover for reactive and emergency work along with ad-hoc tankering.For installations within the Lot as set out in the Procurement Documents.
Lot 7 – Wiltshire
The requirement is for the provision of the following services to sewage treatment plants, septic tank systems, pumping stations, and surface water pumps installations as set out in the procurement documents:• Scheduled maintenance - servicing of installations including the emptying and disposal of wastewater liquor and sludge.• Non-scheduled maintenance works - reactive repairs, emergency works and ad-hoc tankering (where instructed) to maintain the continuous function of the foul water infrastructure assets. • Out of hours and emergency call out service – provision of 24-hour, 365-day cover for reactive and emergency work along with ad-hoc tankering.For installations within the Lot as set out in the Procurement Documents.
Download full details as .pdf
The Buyer:
Aster Group Limited
Additional information:
Link:
Download Full Notice as PDF
Link:
View Notice Source
CPV Code(s):
45252130 - Sewage plant equipment
50000000 - Repair and maintenance services
90400000 - Sewage services