Realization of all the signalling (horizontal and vertical) of the new 2x2 lane section between the A75 and Brioude
This contract includes the realization: - horizontal signage on the current section and interchanges, - directional and police signalling on all lanes impacted by the commissioning of the new route, - dynamic signage, with the installation of 2 variable message signs, - a meteorological station, - a SIREDO counting station, - fiber optic porting