Central-heating boilers | Tenderlake

Central-heating boilers

Contract Value:
-
Notice Type:
Contract Notice
Published Date:
19 August 2019
Closing Date:
20 September 2019
Location(s):
PL821 Krośnieński (PL Poland/POLSKA)
Description:
Replacement of solid fuel central heating boilers with gas or biomass boilers.

The scope of the contract includes the replacement of solid fuel central heating boilers for gas or biomass boilers.

The task consists of:

Part I - condensing gas boilers - 68 pcs:

- disassembly of old heat sources and hot water tanks,

- installation of new gas boilers,

- installation of new hot water tanks,

- installation of boiler room equipment (shut-off and non-return valves, filters, expansion vessels, safety valves and others according to hydraulic diagrams),

- assembly of concentric chimney liners together with the boiler connection with the chimney flue - 68 pcs.,

- flushing and system adjustment.

Part II - biomass boilers (pellets) - 56 pcs:

- disassembly of old heat sources and hot water tanks,

- installation of new pellet boilers,

- installation of new hot water tanks,

- installation of boiler room equipment (pumps, three-way valves, shut-off and non-return valves, filters, expansion vessels, safety valves, cooling valves and others according to hydraulic schemes ...


Condensing gas boilers

Part I - condensing gas boilers - 68 pcs:

- disassembly of old heat sources and hot water tanks,

- installation of new gas boilers,

- installation of new hot water tanks,

- installation of boiler room equipment (shut-off and non-return valves, filters, expansion vessels, safety valves and others according to hydraulic diagrams),

- assembly of concentric chimney liners together with the boiler connection with the chimney flue - 68 pcs.,

- flushing and system adjustment.


Biomass boilers (pellets)

Part II - biomass boilers (pellets) - 56 pcs:

- disassembly of old heat sources and hot water tanks,

- installation of new pellet boilers,

- installation of new hot water tanks,

- installation of boiler room equipment (pumps, three-way valves, shut-off and non-return valves, filters, expansion vessels, safety valves, cooling valves and others according to hydraulic diagrams),

- connecting boilers to existing chimneys,

- installation of chimney liners for premium boilers - 7 pcs,

- flushing and system adjustment.

Download full details as .pdf
The Buyer:
Gmina Brzozów
CPV Code(s):
44621220 - Central-heating boilers