B 29 Expansion of Essingen eels, here: construction phase 2
Road construction Bundestraße B 29 and drainage works:
topsoil up/removal 13,000 m³, earthworks dry/removal 110.000 m³,
Installation of asphalt foundation layer 52,000 m², asphalt base course 52,000 m²,
Install asphalt binder 52,000 m², install asphalt surface layers 52,000 m²
Drainage duct work 5,500 m, shafts 130 pcs
paving slabs/boards/gutters 3.000 m
Road construction ramps:
asphalt foundation layer, built in 8,200 m², asphalt base layer built on 8,200 m²,
Install asphalt binder 8,200 m², install asphalt surface layers 8,200 m²
Roadbuilding OVS Schnaitberg:
Install asphalt foundation layer 400 m², install asphalt base layer 400 m²,
Install asphalt covering layers 400 m², paving/slabs/boards/gutters 50 m
Producing the structures 5, 6 (southern abutment only), 6 a, 7, 7 a, 8, 9, 11.
All of the above points are part of the BIM project “B 29 Expansion Essingen-Aalen, BA 2"! In principle, the BIM method must be used and the AWF 000 to 200 executed!
Working for the municipality of Essingen and GEO:
sewer pipes/ducts approx. 90 m, water pipe approx. 105 m,
broadband empty pipes (trench length) approx. 100 m,
street lighting (trench length) approx. 100 m,
Gas pipeline laying approx. 230 m