Pipe and shaft construction work, building site clearing (route clearing).
Main activities:
Prepare the construction site,
- 5 500 m
- 1 500 m
- 490 m sheeting pipeline trench made of sheet piles, tapes and stiffeners;
Pile driving obstacles;
- 6,000 m³ of soil excavated and transported to the interim storage facility;
Lowering of groundwater;
- Establish 170 m of pipe with base DN 700;
- Remove 90 m of pipe DN 1000/700;
New construction of slide shaft including slide for a pipeline DN 1 400;
- 300 m line clearance up to 2.5 m below GOK;
Clearance holes up to 7 m below GOK.