The object of the contract is to develop a project in accordance with the existing Construction Law (project documentation including land-use, architectural and construction and technical design) for the construction of: water supply network with connections in the village of Poznań as part of the task investment no. 3-05-16-067-1 Poznań — water supply network at the Svyvida Square, together with obtaining the legitimate decision of the construction permit and the fulfilment of the author's supervision during the implementation phase of works carried out on the basis of the documentation on the subject of the contract from Contractor of construction works to sign the final acceptance protocol of these works.
The object of the contract is to develop a project in accordance with the existing Construction Law (project documentation including land-use, architectural and construction and technical design) for the construction of: water supply network with connections in the village of Poznań as part of the task investment no. 3-05-16-067-1 Poznań — water supply network at the Svyvida Square, together with obtaining the legitimate decision of the construction permit and the fulfilment of the author's supervision during the implementation phase of works carried out on the basis of the documentation on the subject of the contract from Contractor of construction works to sign the final acceptance protocol of these works.