Natural gas | Tenderlake

Natural gas

Contract Value:
-
Notice Type:
Contract Notice
Published Date:
05 May 2021
Closing Date:
31 May 2021
Location(s):
DE600 Hamburg (DE Germany/DEUTSCHLAND)
Description:
Supply of natural gas to the Free and Hanseatic City of Hamburg and associated institutions

Delivery of natural gas free of collection point to the Free and Hanseatic City of Hamburg (FHH) and included institutions (EI) for a contract period of 3 years (2022 to 2024).

The total volume is around 507 GWh/a for approximately 1 810 points of collection, divided into 5 lots.

The majority of the collection points are located in the network area of Gasnetz Hamburg GmbH. Other acceptance points are located in the network area E-Werk Sachsenwald GmbH, NBB Netzgesellschaft Berlin-Brandenburg mbH & Co. KG, Schleswig-Holstein Netz AG, Stadtwerke Elmshorn, Stadtwerke Geesthacht GmbH, Stadtwerke Norderstedt. More detailed information can be found in the procurement documents.

The pricing for procurement takes place after the award of the contract on the EEX market place, structured in 8 tranches for the delivery years 2022 and 2023 and in 12 tranches for the delivery year 2024 over a specified period.

Performance-measured acceptance points of the Free and Hanseatic City of Hamburg

Supply of natural gas for the delivery years 2022 to 2024 at 36 natural gas collection points for a total of approximately 115.6 GWh/a.

All tapping points are 1h performance. The 1-hour load profile values over 1 year are made available electronically. Access to the master, consumption and load profile data is made possible after the signed confidentiality declaration has been provided! You can find the corresponding form in the tender documents available on the tender platform.

The contracting entity imitates the ecological requirement that at least 2.5% of the quantities must be supplied as biomethane. A self-declaration on the environmental requirements for the lot shall be provided. The offer must also be submitted with a description of the business customer portal planned for application. Further details can be found in the procurement documents.

Performance Acceptance Points of the Participating Institutions

Supply of natural gas for the delivery years 2022 to 2024 at 28 natural gas collection points for a total of approximately 46.8 GWh/a.

All tapping points are 1h performance. The 1-hour load profile values over 1 year are made available electronically. Access to the master, consumption and load profile data is made possible after the signed confidentiality declaration has been provided! You can find the corresponding form in the tender documents available on the tender platform.

The contracting entity imitates the ecological requirement that at least 2.5% of the quantities must be supplied as biomethane. A self-declaration on the environmental requirements for the lot shall be provided. The offer must also be submitted with a description of the business customer portal planned for application. Further details can be found in the procurement documents.

Non-performance-based collection points of the Free and Hanseatic City of Hamburg and institutions included: Schools and sports fields

Supply of natural gas for the delivery years 2022 to 2024 at 804 natural gas collection points for a total of approximately 166.5 GWh/a.

The standard load profiles used over 1 year are made available electronically.

Access to the master, consumption and debit data will be made possible after the signed confidentiality declaration has been provided! The relevant form can be found in the procurement documents available on the procurement platform.

The contracting entity imitates the ecological requirement that at least 2.5% of the quantities must be supplied as biomethane. A self-declaration on the environmental requirements for the lot shall be provided. The offer must also be submitted with a description of the business customer portal planned for application. Further details can be found in the procurement documents.

Non-performance-measured collection points of the Free and Hanseatic City of Hamburg

Supply of natural gas for the delivery years 2022 to 2024 at 466 natural gas collection points for a total of approximately 59.4 GWh/a.

The standard load profiles used over 1 year are made available electronically.

Access to the master, consumption and debit data will be made possible after the signed confidentiality declaration has been provided! The relevant form can be found in the procurement documents available on the procurement platform.

The contracting entity imitates the ecological requirement that at least 2.5% of the quantities must be supplied as biomethane. A self-declaration on the environmental requirements for the lot shall be provided. The offer must also be submitted with a description of the business customer portal planned for application. Further details can be found in the procurement documents.

Non-performance-level points of acceptance of the institutions included

Supply of natural gas for the delivery years 2022 to 2024 at 476 natural gas collection points for a total of approximately 118.4 GWh/a.

The standard load profiles used over 1 year are made available electronically.

Access to the master, consumption and debit data will be made possible after the signed confidentiality declaration has been provided! The relevant form can be found in the procurement documents available on the procurement platform.

The contracting entity imitates the ecological requirement that at least 2.5% of the quantities must be supplied as biomethane. A self-declaration on the environmental requirements for the lot shall be provided. The offer must also be submitted with a description of the business customer portal planned for application. Further details can be found in the procurement documents.

Download full details as .pdf
The Buyer:
Finanzbehörde Hamburg
CPV Code(s):
09123000 - Natural gas
65210000 - Gas distribution