Construction work for bridges

Contract Value:
-
Notice Type:
Contract Notice
Published Date:
13 October 2023
Closing Date:
21 November 2023
Location(s):
DEE05 Anhalt-Bitterfeld (DE Germany/DEUTSCHLAND)
Description:
B 6n, BA 17 Köthen - A9, VP 17.0.3.1, new BW 118A and BW 119Ü

B 6n, BA 17 Köthen - A9, VP 17.0.3.1, new BW 118A and BW 119Ü

The present construction project is part of the section B 6n BA 17 Köthen - A9 and includes the new construction of the bridges BW 118A and BW 119Ü, which were built in the course of

of the new construction of the B 6n - Köthen to A9.

The bridge structure 118A carries the future B6n over the ditch, the structure 119Ü carries the road K2077 over the B6n.

BW 118A:

approx. 3,700 m Rüttelstopfsäulen

approx. 790 m³ reinforced concrete

approx. 3.500 m³ Dammbaustoff

BW 119Ü:

approx. 1,300 m³ reinforced concrete

approx. 37.000 m³ Dammbaustoff

approx. 6.000 m² Asphaltbau

approx. 840 m Amphibian guidance system steel

approx. 200 m Amphibientunnel

Download full details as .pdf
The Buyer:
Landesstraßenbaubehörde Sachsen-Anhalt Regionalbereich Ost
CPV Code(s):
45221100 - Construction work for bridges