NWM21_CC Nordic Ski World Cup 2021 in Oberstdorf - VE 5201_1 Bridge - Stb - Work
Bridge - Stb - Works.
Reinforced concrete works 350 m³ excavation and installation including backfilling of the building 15 m³ demolition of reinforced concrete 80 m³ reinforced concrete for rebuilding piers and abutments 10 t rebar 130 m 2 Sealing with bitumen welding track 130 m 2 Asphalt surface.