the contract will be divided into 17 lots, it concerns the realization of the following studies and works: - studies of survey of mailboxes - detailed project studies, - realization of the works in air and underground, - passage of the optical cables and their connection on the collection network, the transport network, the service network up to the limit of the PBO, - participation of the holder(s) in the various optical circuit revenue operations Throughout the duration of the work, current services (electricity, telecommunications, ADSL, Broadband, etc.) must not be interrupted or disrupted.
ac Works Electronic communications exceeding 150,000 euro(s) (excl. VAT).