The assignment includes the establishment of three island 355 and one island 125 pressure lines, as well as an island 560/500 gravity line on the St. -0 + 080 to 0 + 520.
This offering is referred to as “LTGV-T2”, and includes the establishment of three ø 355 and one ø 125 pressure lines, as well as an island 560/500 gravity line on the St. -0 + 080 to 0 + 520.
The total drainage works are carried out with a view to subsequently transferring the land to the capital's Letbanes contractor.