construction of the booster station to pressurize the main branch (Pocket 1) of the newly created network, the interconnection pipes of the station with the existing network in DN 400 mm, realization of the civil engineering of the station, and supply and installation of equipment and outdoor facilities
Montagnac booster stationbooster station, equipped:- 4 pumping units with capacities of 3 x 50 l/s and 1 x 20 l/s;- suction and discharge manifolds for pumps;- from valves to suction and discharge of pumps and manifolds of the station;- 2 anti-ram balloons, each connected to one of the station's suction and discharge manifolds, unit volume 2000 and 3000 l;- power and control electrical cabinets;- auxiliary equipment (ventilation, handling, etc.). Realization of the civil engineering of the station and its outdoor facilities