The subject of the contract is the construction of a dry desulphurization installation (1100mg/m3u) for boilers K1, K2, K3 installed at PGNiG TERMIKA Energetyka Przemysłowa S.A. Zakład Pniówek, in accordance with the scope of work contained in the Description of the subject of the contract constituting part II SWZ and under the conditions specified in the Draft provisions of the contract constituting part III of the SWZ.
The subject of the contract is the construction of a dry desulphurization installation (1100mg/m3u) for boilers K1, K2, K3 installed at PGNiG TERMIKA Energetyka Przemysłowa S.A. Zakład Pniówek, in accordance with the scope of work contained in the Description of the subject of the contract constituting part II SWZ and under the conditions specified in the Draft provisions of the contract constituting part III of the SWZ.