The existing day-care centre on the northern edge of Holzkirchen, in Erich-Kästner-Strasse, is to be expanded
become. The extension will be built as a two-storey extension with a staggered gable roof and a
Partial basement built for technical rooms and storage.
Outside, the after-school care area will have two courtyard areas and a garden area with a noise barrier
to Rosenheimerstraße. The construction of the noise barrier is carried out as a separate construction measure.
The soil conditions require special measures in the foundation of the structure.
As a preliminary measure, seepage systems will be built on the property. These must not be run over
Become.
During the entire construction period, the operation of the existing kindergarten will take place.
The structure is to be erected in 3 construction phases. The staggered execution times are shown in the
construction schedule and must be taken into account.
The building will have a partial basement. The surfaces of the wooden components in the interior are finished surfaces
and will not be treated further. They must be protected against contamination and damage.
The energy objective requires a conscientious way of working on the part of all those involved in the construction.
In particular, this means avoiding structural thermal bridges, clean working and a high
Measure of the airtightness of the building envelope
The LV Schreiner - Interior Doors essentially contains the following services:
A total of 70 wooden doors with wooden block frames with the following requirements will be installed:
- Interior doors with wooden block frames, door leaves with HPL coating, some with glass cut-outs
- Wood-framed glass doors with fixed side glazing
- Wood-frame-glass windows with fixed glazing as well as
- Steel doors with corner frames in the basement.
The performance of the contractor is also the testing of the specified material thicknesses with regard to sufficient
Design.
The measurement on site and the prefabrication is to be started after completion of the screed work.
An uninterrupted provision of services cannot be assumed.
The contractor has to provide his services in coordination with the trades HLS and ELT.