Construction work for swimming pool | Tenderlake

Construction work for swimming pool

Contract Value:
-
Notice Type:
Contract Notice
Published Date:
22 September 2023
Closing Date:
23 October 2023
Location(s):
DE11D Ostalbkreis (DE Germany/DEUTSCHLAND)
Description:
KHA - combined pool Hirschbach Aalen

- 3-storey swimming pool new building with basement, ground floor and upper floor, in the slope

built-in with outdoor pool area

- The present course includes a GRP tube slide and a stainless steel

Half-shell slide in the indoor area and a stainless steel half-shell slide in the

Outdoor area

- Tubular slide GRP diameter d = 1200mm, construction in pylon construction; The slide starts from a starting platform inside the building tower and ends with a shallow water outlet, which is located in front of the

The building begins as a tunneled area and ends inside the building with an exit staircase at the front.

Slide system including planning and static calculation, delivery and installation, traffic light system, LED light effect equipment, landing pool, façade penetration, acceptance of use

Overall length: 58.00 m

Difference in altitude: 6.92 m

1 pc.

- Children's water slide made of stainless steel (1.4571, V4A). t = 2.5 mm, welded, sanded and polished without joints, including support structure made of stainless steel as well as ladder ascent and starting platform with stainless steel railing, planning

and static calculation, delivery and assembly as well as acceptance of use

Overall length: 11.20 m

Width: 800 mm

Difference in altitude: 2.00 m

2 pcs.

Download full details as .pdf
The Buyer:
Stadtwerke Aalen GmbH
CPV Code(s):
45210000 - Building construction work
45212212 - Construction work for swimming pool
45223100 - Assembly of metal structures
45223210 - Structural steelworks