The purpose of this consultation is to conclude a service contract on the occasion of a technical stop for the oceanographic vessel: Tethys II
LOT DRY WEDGEDRY DOCK LOT grouping the chapters:
A1 – MAIN ENGINE MECHANICAL WORK
A2 – MECHANICAL WORK GENERATOR SETS
A4 - MECHANICAL WORK PUMPS AND AUXILIARIES
B – DRY BILGE MECHANICAL WORK
C - PIPING WORK
D – TOLEERIE WORKS
F - PAINTING WORK AND CAPACITY
H – DRY AND SERVICES
HYDRAULIC AND GEAR PACKAGEHYDRAULIC AND EQUIPMENT LOT composed of the chapter:
A5 – HYDRAULIC AND EQUIPMENT MECHANICAL WORK
LOT FRIDGE AND AIR CONDITIONINGLOT FRIDGE AND AIR CONDITIONING:
A3 - fridge and air conditioning work
LOT ELECTRICITELOT ELECTRICITE :
E - ELECTRICAL WORKS
LOT EMMENAGEMENTSLOT EMMENAGEMENTS :
G – WORK IN THE MOVES