The Ottersleben elementary school is a five-class elementary school with day-care facilities.
The existing buildings are not enough to accommodate all pupils, so
that
the first classes are currently in a different building. For
the development of an extension building is part of the school management
coordinated room program. This sees a significant expansion
of the current stock of space.
Urban planning concept and building structure In Magdeburg-Ottersleben, in
Richard Dembny Street 41, is being built on the approx. 1,960m²
an extension of the primary school Ottersleben for school
also hoarding.
- approx. 4500 m2 preparation coating
- repair approx. 500 m2 of plaster defects
- approx. 4500 m2 adhesive bridge application
- approx. 3400 m2 dispersion filler on plaster surfaces, Q2
- approx. 3400 m2 dispersion paint as base and top coating on plaster
- approx. 1500 m2 acrylate dispersion paint on plaster
- approx. 500 m2 accent colour in stairwells
- approx. 570 m dispersion paint on plastered soffits
- approx. 1000 m2 dispersion filler on reinforced concrete Q2
- approx. 1000 m2 painter's fleece on reinforced concrete
- approx. 1000 m2 dispersion paint as base and top coat on reinforced concrete
- approx. 1000 m2 dispersion paint as base and top coat on reinforced concrete
- approx. 500 m2 acrylate dispersion paint on reinforced concrete
- approx. 120 m2 wall coating drywall
- approx. 80 m2 reinforced concrete ceiling coating
- approx. 750 m2 ceiling coating drywall
- approx. 100 m2 coating of stair soffits and stair bolsters
- approx. 80 m2 floor coating epoxy resin
- approx. 55 m coating stair railing with steel dispersion varnish
- approx. 300 m coating of steel enclosure frames
- approx. 500 m closing of wall joints in precast concrete elements
- ca. 3500 m Acrylfugen