Establishment of a GMP area with approx. 300 m² in the central pharmacy for a maximum supplier as a general contractor.
Establishment of a GMP area with approx. 300 m² in the central pharmacy for a maximum supplier as a general contractor.
The service includes the implementation planning, expansion and equipping as well as commissioning of the GMP area in accordance with the pharmacy operating regulations and in accordance with the European Pharmacopoeia with, for example:
- Cleanroom walls, doors, windows, ceilings and floors
- Materialdurchreichen
- ventilation technology
- Medical and laboratory equipment: 2 safety cabinets, 2 laminar flow areas, fume cupboards, medical refrigerators, medical freezers
- Laboratory furniture (fixed installations) made of stainless steel and solid plastic
- High and low-current systems
- plumbing