For the evacuation of the former ammunition depot in Mitholz, the current plant must be shut down in advance. Even when decommissioned, a power supply is required. For this purpose, two boreholes of approx. 130 m each (loose rock and rock) are necessary in the plant. The construction of the starting pit (slope cut) is procured in a separate procedure and is not part of the tender.
(cf. document "C1 performance description Mitholz new transformer station")
For the evacuation of the former ammunition depot in Mitholz, the current plant must be shut down in advance. Even when decommissioned, a power supply is required. For this purpose, two boreholes of approx. 130 m each (loose rock and rock) are necessary in the plant. The construction of the starting pit (slope cut) is procured in a separate procedure and is not part of the tender.