Orkdal kommune shall establish a new water supply from Steinshaugen. This contract, E06, concerns the second part of the transfer system, from Mobekken up until future clean water storage tank at Digerås. E06 comprises trench works for and delivery/assembly of material for:
— Approx. 1.7 km Ø400 and Ø180 mm water pipeline,
— Approx. 850 m Ø150-315 mm drainage and surface water gravity pipeline,
— Approx. 1.7 km cable conduit for fibre; Road and water stream intersections.
Orkdal kommune shall establish a new water supply from Steinshaugen. 3 ground water wells have been established and shall be expanded. The following shall be constructed: new water treatment installation, local waste water installation, transfer system for drinking water to the new elevated basin at Digerås before connection to the existing water supply system at Fannrem. This contract, E06, concerns the second part of the transfer system, from Mobekken up until future clean water storage tank at Digerås. The entire project will be carried out as joint projects with start up at different dates throughout the construction period of approx. two and a half years. The remaining contracts, E01-E03 and E04-E08 will be announced consecutively. See the attached map for an overview of the contract division. E06 comprises trench works for and delivery/assembly of material for: Approx. 1.7 km Ø400 water pipeline with associated manholes and other installations; Approx. 1.7 km Ø180 mm water pipeline with associated manholes and other installations; Approx. 850 m Ø150-315 mm drainage and surface water gravity pipeline with associated manholes and other installations; Approx. 1.7 km cable conduit for fibre; Road and water stream intersections.