Extension of the secondary school Mühldorf am Inn
The development for wastewater (sewer connection) takes place via the existing sewage pipes.
The rainwater is seeped away on the property.
Sanitärarbeiten
approx. 250 m sewage pipe made of PP-MD DN 50 to DN 150
approx. 494 m drinking water pipe made of stainless steel with press connection
1 piece floor drain DN70
approx. 18 toilet and urinal systems
approx. 22 washbasin and sink systems
approx. 18 pieces instantaneous water heater up to 21 KW
approx. 10 units barriers DN 15 to DN 50