Operation of a sewage plant | Tenderlake

Operation of a sewage plant

Contract Value:
EUR 121M - 121M
Notice Type:
Contract Notice
Published Date:
28 December 2020
Closing Date:
17 March 2021
Location(s):
ES62 Región de Murcia (ES Spain/ESPAÑA)
Description:
Operation and control service of the purification system of the Region of Murcia

The renewal of the hiring of:

1) the management of purification infrastructures by companies specialized in the maintenance and operation of the treatment plants of the municipalities included in the following ten geographical areas of exploitation: Mar Menor, Mazarrón-Puerto Lumbreras, Bajo Guadalentín, Campo de Cartagena, Molina -Alguazas, Vega Media, Levante, Alcantarilla-Río Mula, Vega Alta and Altiplano;

2) the administrative contracts that have been signed to support the Entity in the tasks of process control, sampling and analytical control of wastewater. The control works have been divided into two control areas to optimize human resources and the rest of the synergies of a contract of this nature.

Operation of facilities in the Mar Menor area

The exploitation work specifically includes the tasks necessary for the elements of the facilities to fulfill the tasks for which they were designed and to do so in optimal operating conditions, without odors and continuously and uninterruptedly:

- Preventive and corrective maintenance of the facilities,

- Analytical control of the influent and effluent parameters that guarantee an optimal discharge,

- Analysis of the operation of the facilities, determining the performance of the different stages,

- Management of waste generated at the facilities.

Operation of facilities in the Molina-Alguazas area

The exploitation work specifically includes the tasks necessary for the elements of the facilities to fulfill the tasks for which they were designed and to do so in optimal operating conditions, without odors and continuously and uninterruptedly:

- Preventive and corrective maintenance of the facilities,

- Analytical control of the influent and effluent parameters that guarantee an optimal discharge,

- Analysis of the operation of the facilities, determining the performance of the different stages,

- Management of waste generated at the facilities.

Control I SOUTH Zone

Control work includes:

- Analytical control of the influent and effluent parameters,

- Analysis of the operation of the facilities, determining the performance of the different stages,

- Sludge control

- Environmental surveillance work

- Supervision of the work carried out by the companies operating the facilities

Control II North Zone

Control work includes:

- Analytical control of the influent and effluent parameters,

- Analysis of the operation of the facilities, determining the performance of the different stages,

- Sludge control

- Environmental surveillance work

- Supervision of the work carried out by the companies operating the facilities

Operation of facilities in the Mazarrón-Puerto Lumbreras area

The exploitation work specifically includes the tasks necessary for the elements of the facilities to fulfill the tasks for which they were designed and to do so in optimal operating conditions, without odors and continuously and uninterruptedly:

- Preventive and corrective maintenance of the facilities,

- Analytical control of the influent and effluent parameters that guarantee an optimal discharge,

- Analysis of the operation of the facilities, determining the performance of the different stages,

- Management of waste generated at the facilities.

Operation of facilities in the Bajo Guadalentín area

The exploitation work specifically includes the tasks necessary for the elements of the facilities to fulfill the tasks for which they were designed and to do so in optimal operating conditions, without odors and continuously and uninterruptedly:

- Preventive and corrective maintenance of the facilities,

- Analytical control of the influent and effluent parameters that guarantee an optimal discharge,

- Analysis of the operation of the facilities, determining the performance of the different stages,

- Management of waste generated at the facilities.

Operation of facilities in the Campo de Cartagena area

The exploitation work specifically includes the tasks necessary for the elements of the facilities to fulfill the tasks for which they were designed and to do so in optimal operating conditions, without odors and continuously and uninterruptedly:

- Preventive and corrective maintenance of the facilities,

- Analytical control of the influent and effluent parameters that guarantee an optimal discharge,

- Analysis of the operation of the facilities, determining the performance of the different stages,

- Management of waste generated at the facilities.

Operation of facilities in the Alcantarilla-Río Mula area

The exploitation work specifically includes the tasks necessary for the elements of the facilities to fulfill the tasks for which they were designed and to do so in optimal operating conditions, without odors and continuously and uninterruptedly:

- Preventive and corrective maintenance of the facilities,

- Analytical control of the influent and effluent parameters that guarantee an optimal discharge,

- Analysis of the operation of the facilities, determining the performance of the different stages,

- Management of waste generated at the facilities.

Vega Media area facility operation

The exploitation work specifically includes the tasks necessary for the elements of the facilities to fulfill the tasks for which they were designed and to do so in optimal operating conditions, without odors and continuously and uninterruptedly:

- Preventive and corrective maintenance of the facilities,

- Analytical control of the influent and effluent parameters that guarantee an optimal discharge,

- Analysis of the operation of the facilities, determining the performance of the different stages,

- Management of waste generated at the facilities.

Levante area facility operation

The exploitation work specifically includes the tasks necessary for the elements of the facilities to fulfill the tasks for which they were designed and to do so in optimal operating conditions, without odors and continuously and uninterruptedly:

- Preventive and corrective maintenance of the facilities,

- Analytical control of the influent and effluent parameters that guarantee an optimal discharge,

- Analysis of the operation of the facilities, determining the performance of the different stages,

- Management of waste generated at the facilities.

Operation of facilities in the Vega Alta area

The exploitation work specifically includes the tasks necessary for the elements of the facilities to fulfill the tasks for which they were designed and to do so in optimal operating conditions, without odors and continuously and uninterruptedly:

- Preventive and corrective maintenance of the facilities,

- Analytical control of the influent and effluent parameters that guarantee an optimal discharge,

- Analysis of the operation of the facilities, determining the performance of the different stages,

- Management of waste generated at the facilities.

Operation of facilities in the Altiplano area

The exploitation work specifically includes the tasks necessary for the elements of the facilities to fulfill the tasks for which they were designed and to do so in optimal operating conditions, without odors and continuously and uninterruptedly:

- Preventive and corrective maintenance of the facilities,

- Analytical control of the influent and effluent parameters that guarantee an optimal discharge,

- Analysis of the operation of the facilities, determining the performance of the different stages,

- Management of waste generated at the facilities.

Download full details as .pdf
The Buyer:
Entidad de Saneamiento y Depuración de Aguas Residuales de la Región de Murcia (ESAMUR)
CPV Code(s):
71300000 - Engineering services
90481000 - Operation of a sewage plant