Construction work | Tenderlake

Construction work

Contract Value:
-
Notice Type:
Contract Notice
Published Date:
28 February 2023
Closing Date:
31 March 2023
Location(s):
PL227 Rybnicki (PL Poland/POLSKA)
Description:
Improving energy efficiency in Żory educational institutions and sport. Along with their expansion as part of the project. co-financed by the Government Fund Polish Governance: Strategic Investment Programme

The subject of the contract is the implementation of an investment involving the improvement of energy efficiency in educational and sports institutions in Żory along with their expansion as part of a project co-financed by the Government Fund Polish Ład: Strategic Investment Program.

The order was divided into 5 parts

Part 1 - Extension and reconstruction of the OSP Rogoźna building at 119 Wodzisławska Street

Part 2 - Extension with reconstruction and renovation of ZSP No. 7 in Osiny at Szkolna Street

Part 3 - Modernization of the façade of the SP-3 building at Klimka Street

Part 4 - Extension of the SP No. 1 building along with the construction of an athletics track, partial fencing of the area and thermo-modernization of the existing school building

Part 5 – Extension and thermomodernization of the ZSP-9 building in Rowń at 226 Rybnicka Street

Extension and reconstruction of the OSP Rogoźna building at 119 Wodzisławska Street

Surface and cubature indicators of the object

existing part TSO design part TOTAL

+ offices + sports hall

+ sports hall facilities

(1.) (2.)

Area: 885, 77 m², 153.46 m², 1039, 23 m²

Total area 1131,29 m² 184,98 m² 1316, 27 m²

Footprint area 732,08 m² 105,95 m² 838,03 m²

Internal space 964,34 m² 155,94 m² 1120, 28 m²

Building height 9.75> 12 m 8.57 > 12 m 9.75> 12 m

Number of storeys 2 – hall 1 2 2

A. General construction works:

1. Extension and reconstruction of the TSO building, reconstruction of the office and educational building, reconstruction of the sports hall building, reconstruction and superstructure of the sports hall back building in Żory Rogoźna at 119 Wodzisławska Street together with all accompanying works, including m.in. earthworks, reinforced concrete, masonry, roofing, construction, assembly, plastering, flooring, finishing, façade, installation of joinery and window and door joinery, renovation, etc. etc.

B. Land development: 1.Organization of the construction site, organization of construction facilities, 2.Geodetic works – delineation of investments in the field, as-built geodetic measurement (full geodetic service), 3.Demolition works, e.g. demolition of existing concrete and paving surfaces, 4. Execution of pavement surfaces, access and maneuvering road – surfaces made of gr.8cm paving stones, It is forbidden to use "behaton" paving stones for paving surfaces. 5. Humming of areas intended for greenery along with sowing grass, 6. Cleaning works after construction works, 7. Works related to the delivery and assembly of prefabricated retaining walls. C. The scope of electrical works includes installations: 1.Distribution of electricity; 2.Basic lighting; 3.Emergency backup lighting; 4. Emergency evacuation lighting; 5. Sockets; 6. 3 phase power supply; 7. Surge protector; 8. Anti-electric shock; 9. Lightning protection; 10. Telecommunication installation; 11. CCTV installation; 12. Installation of intrusion alarm; 13. Installation for reception of commercial television.

D. The scope of installation works includes:1. Installation of central heating; 2.Gas installation;3. Gas boiler room;4. Installation of mechanical ventilation and air conditioning;5. Installation of internal and external sanitary sewage system;6. Installation of internal and external storm water drainage;7. installation of cold and hot water;

Extension and reconstruction and renovation of ZSP No. 7 in Osiny at Szkolna Street

1) Characteristic technical parameters: 1. School designed part (extension): • Volume - 9248,00 m2 • Usable area - 1988,59 m2 • Total area - 2383,50 m2 • Building area - 476,70 m2 • Height - 17,55m • Number of storeys - 5 2. School existing part: • Cubic volume - 4149,30 m2 • Usable area - 1073,30 m2 • Total area - 1318,74 m2 • Building area - 439,58 m2 • Height - 9,65m • Number of storeys - 3 3. School existing part (gymnasium segment): • Cubic capacity - 4383,00 m2 • Usable area - 867,05 m2 • Total area - 1379,80 m2 • Built-up area - 686,90 m2 • Height - 10,98m • Number of storeys - 2 2) General construction works: 1.The first stage of the ZSP-7 extension includes a 5-storey building (4 above-ground floors) from the south-east side with all accompanying works, including m.in. earthworks, reinforced concrete, masonry, roofing, roofing, structural, assembly, plastering, flooring, finishing, façade, installation of joinery and window and door joinery, façade 2.The second stage includes the reconstruction of the existing facility with all accompanying works, including m.in. demolition, reinforced concrete, masonry, construction, assembly, plastering, flooring, finishing, installation of joinery and window and door joinery, etc. etc. 3.The third stage includes thermomodernization of the existing facility with all accompanying works, including, m.in. earthworks, roofing, assembly, plastering, renovation, insulation, façade, finishing, installation of joinery and window and door joinery, etc., etc.3) Land development, including m.in. construction of a multifunctional pitch with a polyurethane surface of the "shower" type (handball / football field, basketball, volleyball) and execution of a run-up (running track) for jumping in dal with a polyurethane surface length of 30m, polyurethane surfaces made on an appropriate foundation with drainage limited around the perimeter by a concrete edging 8x30cm, on the surface painted lines with specialized polyurethane paint of white and yellow color, pitch and running track equipped with sports equipment: 2x goals, baskets 2x, volleyball set, rebound beam placed in the raceway made of epoxy laminated resin, long jump or sandbox measuring 8x3.5m made of plastic elements; making a ball catcher around the pitch 6m high and 96.8 m long, ball catcher made of green polypropylene mesh with a mesh of 10x10cm and a thickness of 5mm weave attached to a steel structure made according to the manufacturer's system. 4) Electrical works 5) Installation work.

Modernization of the façade of the SP-3 building at Klimka Street

The general scope of works related to the building SP No. 3 is m.in.: 1. Injection with cream for injection of foundation walls from the inside of the rooms according to Figure No. 13. 2. Execution of drainage along the western wall of the building along with connection to the rainwater sewage system and execution of a gravel band according to drawing No. 00. 3. Renovation of basement lighting. 4.Renovation of the entrance to the basement of the gym.5. Execution of waterproofing and thermal insulation of foundation walls. 6. Renovation of stairs. 7. Insulation of external walls with heat-insulating plasters, silicone plasters and painting. 8. Replacement of window joinery. 9. Renovation and replacement of door joinery.10. Renovation of entrance canopies.11. Replacement of flashings, external window sills, gutters and downspouts. 12. Cleaning and renovation of brick façade elements.13.Dismantling and installation of new balustrades. Scope of works not included in the scope of implementation according to the annex "works outside the scope of wyk." This m.in.: 1. Renovation of the descent and external stairs to the basement of the building (from the north) 2. Renovation of external stairs from the east side of the building 3.Renovation of basement lights from the east 4.Execution of waterproofing and thermal insulation of foundation walls 5.Execution of pressure injection of walls outside on the south and east side of the building 6.Drainage along the eastern wall of the building with connection to the rainwater drainage system NOTES 1.Building The Primary School at 7 Klimka Street in Żory is located in the area of a historic urban layout, entered into the register of monuments by the decision of the provincial conservator of monuments of February 16, 1966 under the number A/585/662. The Silesian Provincial Conservator of Monuments in Katowice issued a permit No. K/1328/2021 to carry out construction works at a monument entered in the register The contractor is obliged to perform construction works in accordance with the said permit.

Extension of the SP No. 1 building along with the construction of an athletics track, partial fencing of the area and thermo-modernization of the existing school building

Area and cubature indicators of the facility: • building area A - 298.0 m2 • total area A - 578 m2 • usable area A - 466.54 m2 • cubic volume A - 2 295 m3 • height of the building. A - 10,0 m • entrust. built-in. B - 64,4 m2 • total area B - 64,4 m2 • usable area B - 52,63 m2 • volume B - 270 m3 • building height B - 6.3 m A. Rob. Ogólnobud:1. The first stage will include. Addition of a one-storey building. until noon. The walls of one of the middle segments of the building. School with all the robots comrade. 2. The second et. includes the add. two-storey building. to the west wall of the gym with all the robot.companion.3.Third et. embrace. thermomodernization of the existing facility with all accompanying works, including, m.in. roofing, assembly, plastering, renovation, insulation, façade, finishing, installation of joinery and window and door joinery, etc., etc.4. Fourth et. embrace. Renovation of wooden façade and terrace floors existing. kindergarten facility with regard to: grinding, dedusting, washing, replacement of damaged elem. seats along the façade, securing the workplace, cleaning after work, painting twice with specialized façade paint and oiling the terrace surface. 5.Fifth et. embrace. delivery and assembly of ELEM. fixed equipment in accordance with the document. design.B. Land development:1. Organization of the construction site, organization of the building facilities2.Geodetic works – delineation of investments in the field, geodetic measurement. powykon. (full geodetic service).3. Demolition works, e.g. demolition of existing paving surfaces, demolition of existing roofs. playground interfering with the investment, 4. Ex. believe. paving pavements, pedestrian routes and maneuvering area – surfaces made of concrete paving stones gr.8cm type of gray beveled rectangle, paving surfaces made on the appropriate foundation. limited by a concrete curb 15x30cm (roads, accesses) or concrete edging 8x30cm (sidewalks, accesses), It is forbidden to use "behaton" paving stones for paving surfaces. 5. Ex. athletics track with polyurethane surface (4-track track 80m long) and long jump run-up with polyurethane surface length 40m, top. treadmills made on the rep. podbud. limited by a concrete edging 8x30cm, on the surface of the raceway painted lines with specialized polyurethane paint of white color, treadmills equipped with sports equipment: a beam for reflection placed in the treadmill. made of laminated epoxy resin, long jump or sandbox with dimensions of 8x4m made of plastic elements, 6. Works related to the kennel. a high 3-meter concrete fence along the south. and the western boundary of the school grounds, 7. Ex. rebuild. existing playground to the extent interfering with the planned investment: dismantling and rearrangement of playground equipment, reconstruction. EPDM safe surface, rearrangement of the playground fence, wyk. widening of the inland Safety. sandy playground fun near the sports field, 8. Ex. gravel band around the extended part of the kennel. according to the doc. Submitted by the project on 9. Ex. cutting down shrubs and trees interfering with the planned investment (shrubs and trees that do not require obtaining a decision on felling permit), humus of areas for use. under the greenery with the laying of grass from the roll, 10. Cleaning works after construction works.. C. Scope of electrical works 1. Chapter en. electrical;2. Lighting bases.; 3. Emergency lighting. stock.; 4. Emergency lighting. evacuation;5. Sockets;6. Surge protector;7. Anti-electric shock;8. Lightning protection;9. Rebuild. outdoor lighting; 10. Installation of teletech.; 11. Instal. CCTV;12.instal. signaling. Hack; 13.Instal. clock and bell; 14.Intercom installation D. Scope of installation works: 1.Installation of central heating; 2. Reconstruction. external instal. gas;3.Instal. mechanical ventilation. (hybrid); 4.Rebuild. Manifold 5. Install sewerage. sanitation.6. Instal. sewerage. rain.7.install cold and hot water.

Extension and thermomodernization of the ZSP-9 building in Rowń at 226 Rybnicka Street

A. Scope of general construction works - extension The scope of works includes the extension of the existing school constituting part of the School and Preschool Complex No. 9 in Żory, with additional classroom rooms and providing new communication between the existing school buildings and the gymnasium at the site of the planned demolition of the existing connector building. In addition, a lifting platform for people with disabilities (including wheelchair users) has been designed in the new building. The expanded school building will be equipped with the following internal installations: electrical, low-current, lightning protection, cold and hot water, sanitary sewage system, gas and central heating. The building will have no basement, with three above-ground floors (ground floor, first floor and second floor), made in a monolithic reinforced concrete structure - foundations, ceilings and internal stairs, brick - external and internal walls. The foundations of the building will be made on foundation benches, poured monolithically with brick walls above the ground, which will be insulated with mineral wool slabs. The ceilings (including the roof structure) will be made as monolithic reinforced concrete, flat roof with attics, insulated with mineral wool with heat-weldable roofing felt that does not spread fire. Due to the extension of the existing school with additional classrooms, it is planned to demolish the existing connecting building with a staircase between the existing school buildings and the gymnasium, serving as a communication. The building with dimensions: length 9.10 m x width 7.91 m x height 7.29 m, is a two-storey building without a basement. The building is partially overhung and based on columns, made in a brick structure - walls, monolithic reinforced concrete - ceiling, internal stairs and columns, and wooden - roof truss. The roof of the building, made as a gable roof, is partially symmetrical, covered with trapezoidal sheet. External window and door joinery - PVC. The connecting building with the staircase is separated from the existing school buildings and the gymnasium.

Usable area: 414.40 m2 including Usable area of the ground floor: 138.32 m2 Usable area of the first floor: 138.04 m2 Usable area of the second floor: 138.04 m2 Building height: 11.30 m Building height – III storeys, above ground, low building (N) Net volume 1366.97 m3 Gross cubic volume: 1923.74 m3

B. Electrical works C. Installation works D. Land development E. Thermomodernization, including, m.in. a. replacement of window and door joinery, b. insulation of the façade in ETICS technology, c. insulation of the roof of the A-B connector, d. insulation of the ceiling of the last floor, e. replacement of roofing made of steel sheet.

Download full details as .pdf
The Buyer:
Gmina Miejska Żory
CPV Code(s):
42416100 - Lifts
44212310 - Scaffolding
45000000 - Construction work
45100000 - Site preparation work
45110000 - Building demolition and wrecking work and earthmoving work
45111000 - Demolition, site preparation and clearance work
45111200 - Site preparation and clearance work
45112700 - Landscaping work
45113000 - Siteworks
45212220 - Multi-purpose sports facilities construction work
45214200 - Construction work for school buildings
45223100 - Assembly of metal structures
45233200 - Various surface works
45233250 - Surfacing work except for roads
45260000 - Roof works and other special trade construction works
45261000 - Erection and related works of roof frames and coverings
45262100 - Scaffolding work
45262300 - Concrete work
45262310 - Reinforced-concrete work
45262410 - Structural steel erection work for buildings
45262500 - Masonry and bricklaying work
45262690 - Refurbishment of run-down buildings
45310000 - Electrical installation work
45311100 - Electrical wiring work
45311200 - Electrical fitting work
45312310 - Lightning-protection works
45314200 - Installation of telephone lines
45315300 - Electricity supply installations
45317300 - Electrical installation work of electrical distribution apparatus
45320000 - Insulation work
45331100 - Central-heating installation work
45331110 - Boiler installation work
45331200 - Ventilation and air-conditioning installation work
45332200 - Water plumbing work
45332300 - Drain-laying work
45333200 - Gas meter installation work
45400000 - Building completion work
45410000 - Plastering work
45421000 - Joinery work
45421100 - Installation of doors and windows and related components
45421146 - Installation of suspended ceilings
45422000 - Carpentry installation work
45430000 - Floor and wall covering work
45432100 - Floor laying and covering work
45432120 - False floor installation work
45442100 - Painting work
45442110 - Painting work of buildings
45443000 - Facade work
45453000 - Overhaul and refurbishment work
45500000 - Hire of construction and civil engineering machinery and equipment with operator