Engineering studies | Tenderlake

Engineering studies

Contract Value:
EUR 330K - 330K
Notice Type:
Contract Notice
Published Date:
14 October 2022
Closing Date:
15 November 2022
Location(s):
FRF22 Aube (FR FRANCE)
Description:
Inspections of the Aube Storage Centre's facilities at earthquake holding

Following the accident at the Fukushima nuclear power plant, the Nuclear Safety Authority (ASN) asked Andra to carry out a Supplementary Safety Assessment (SCE) for the Aube Storage Centre (CSA). This assessment consists of reassessing the safety margins of the Basic Nuclear Installation (INB n°149) with regard to extreme natural events that would lead to a serious accident on the installation. The reassessment shall cover the behaviour of the installation in the face of extreme situations and the effectiveness of measures to prevent and reduce the consequences. The extreme natural aggressions to be taken into account are flooding, lightning, hail, snow, high winds, tornado and earthquake. As part of the investigation of the 2016 safety review file, Andra made several commitments related to the earthquake.

On the basis of the commitments made by Andra, the following studies are to be carried out as follows:

- Study of the overall stability, the resistance of the structural elements and the maintenance of the support function of the ACD EIPs.

- Evaluation of the behaviour of the ACD pump room with regard to the seismic design hazard for the operation phase.

- Earthquake sizing for the operation phase, the overall stability of the handling bridge of the transit vessel, the absence of projectile creation by the same bridge and analyzes the resistance of the assemblies of the transit building framework.

- Verification of the presence of the minimum seismic construction provisions of the service building demonstrating that it does not constitute an aggressor vis-à-vis the ACD.

- Justification of the envelope nature of the seismic accelerations used for the calculation of the stability of the handling bridges of the mobile frameworks in order to guarantee the absence of risk of falling of the bridges on the structures and packages.

Conduct of studies (cf. synoptic of studies):

|| Firm Slice Seismic hazards of exploitation

Step 1: Knowledge of the documentation and on-site readings

Step 2: Writing a report that lists all the assumptions taken into account as well as the methodology

Step 3: Writing calculation notes for the seismic hazard associated with the operation phase. This step is the subject of a stopping point in the form of written notes transmitted to Andra.

Deliverables: For the TF, the holder must provide at least 5 notes of hypotheses and 7 notes of calculations.

Optional tranche 1 || Seismic hazards of exploitation

Step 4: Reinforcement notes including budget estimate of the work

Condition: Depending on the results of the calculations in step 3, optional tranche 1 is strengthened if corrective technical solutions, reinforcements and/or special provisions are to be implemented. Separate reports from the calculation notes are written.

Deliverables: For TO1, the incumbent will be required to provide a maximum of 7 reinforcement notes.

Optional tranche 2 || Seismic monitoring hazards

Step 5: Comparative study of the seismic hazard associated with the monitoring phase and the operation phase

Condition: Depending on the solutions proposed in step 4, optional tranche 2 is strengthened. In any case, step 5 can be started only if step 4 has been retained upstream.

Deliverables: For TO2, the incumbent will be required to provide a maximum of 9 reinforcement notes.

Download full details as .pdf
The Buyer:
Andra (Agence nationale pour la gestion des déchets radioactifs)
CPV Code(s):
71310000 - Consultative engineering and construction services
71315210 - Building services consultancy services
71335000 - Engineering studies
71351500 - Ground investigation services