On behalf of the BMVg, the heat generation in the Müritz barracks Waren is to be renewed. According to HOAI 2021, the planner must first provide performance level 1 (EBU), taking into account energy requirements on the basis of the concept sample planning for heat with HZ II. Basic performance: based on MPL Heat: AG 2 and 8; LS1 (17.45%), LS2 (16.8%), LS3 (10.55%), LS4 (34.45%) Basic performance: AG 1, 4 and 5; LS1 (25.9%), LS2 (22.0%), LS3 (10.55%), LS4 (34.45%) Benefits:1. Coordination of the overall project including all cost groups 2. Implementation of an approval procedure in accordance with 4.
3. Optimize the concept of model planning with regard to the use of renewable energies. To this end, technically sensible variants should be presented and considered economically. Contribution to construction document: 05/24; Start of construction: 04/25; Completion 10/26
Scope of services: LS1(LPH2-4), optional LS2,3,4(LPH5-8) anr. Gross costs in TEUR (08-2023): AG1: 51; AG 2: 1,996, AG 4: 220, AG 5: 20, AG 8: 200
In accordance with the VgV 2016, the planning contract is awarded via a negotiated procedure with a competitive tender. The candidate who can be expected to find the best possible solution to the task on the basis of his offer receives the order.
According to the announcement point IV.1.5 "Information on the negotiation", the Client reserves the right to award the contract on the basis of the original offers without conducting negotiations. In the event that a negotiation can be dispensed with, the evaluation of point 1.6 of the evaluation matrix 2 with regard to the personal introduction of the employees of the project team is omitted.
According to HOAI 2021 §§53-56, the planner to be commissioned must first provide the service phases 2 to 4. The capacities required to guarantee the target dates must be available. The further performance levels are to be awarded in stages, but remain reserved and are made by written notification.