Heizungsarbeiten
The heat supply is provided by a connection to the heating system of the Laurenz primary school
by means of a local heating pipe. The rooms are heated by means of underfloor heating.
The underfloor heating is controlled by means of an individual room control system, which is controlled by a building management system.