The city of Oelde is planning the construction of a new wastewater pumping station including an associated new da 280 pressure pipeline (DRL) for transporting the wastewater from the district of Lette in the north of the city of Oelde towards the sewage treatment plant southwest of Oelde.
The new construction of the pumping station and DRL will be divided into the following construction phases:
- Pressure pipeline and sewer, section Lönsweg, station 0+025 to 0 +175
- Pressure pipeline station 0 +000 to 0 +025 and 0+175 to 6+934,
New construction of the waste water pumping station
This tender is about the scope of services pressure pipeline station 0+000 to 0+025 and 0+175 to 6+600, new wastewater pumping station
The present case concerns the scope of services pressure pipeline station 0 +000 to 0 +025 and 0+175 to 6+600, new waste water pumping station
This mainly includes the following services:
rd. 6 .850 m Druckrohrleitung DA 2 80 SDR 11
From that
approx. 2,900 m in open construction; approx. 3,850 m in closed design by means of controlled HDD bore; approx. 6 3 m retracted in tunnelling DN 5 00 (microtunnel construction) as a protective tube; Production of 3 precast ventilation structures; Production of 4 emptying shafts in precast construction methods; approx. 63 m of tunnelling ( microtunnel ) DN 500 under DB systems; New construction of the waste water pumping station with a capacity of Qmax = 56.70 l / s in mixed construction of reinforced concrete and masonry; Surface restoration, mainly bituminously fastened, over the entire route as well as approx. 2 2 m of canal construction in open construction, pipes DN / O D 3 15 incl. Shaft structures DN 1200