Renovation of Teckschule Wernau (3.BA) and renovation of kindergarten "Haus des Kind" - Light metal work
The construction site is located in the area of the area of the "Teckschule".
The school building is to be completely renovated in 3 construction phases, the subsequent kindergarten "House of the Child" is also to be renovated.
The present list of services includes the work in the 3rd construction phase of the school building (extension basement and ground floor) as well as in the kindergarten "House of the Child" (ground floor).
It is a solid building from the 1960s.
School building area
Outer walls:
Masonry, concrete
Cover:
via basement: ribbed ceiling and concrete ceiling
above ground floor: ribbed ceiling
Kindergarten area
Outer walls:
Masonry, concrete
Cover:
above ground floor: reinforced concrete ribbed ceiling and concrete ceiling
The building services are completely renewed.
The building envelope (windows, roof surfaces and facades) will be preserved. Floor plan changes and modernizations are made.
In the buildings adjacent to the construction site, school operations will continue.
Extent of the work:
Teckschule:
- Mullion transom façade approx. 42 m2
- Smoke protection doors approx. 1 piece
Child's house:
- Smoke protection doors approx. 1 piece
- Input element approx. 1 piece
- Finger clamp protection approx. 4 pieces