Construction work for waterways | Tenderlake

Construction work for waterways

Contract Value:
EUR 14M - 14M
Notice Type:
Contract Notice
Published Date:
11 February 2022
Closing Date:
30 March 2022
Location(s):
DE300 Berlin (DE Germany/DEUTSCHLAND)
Description:
fairway adaptation Berlin North Route, Spandau Horn, How-km 0.288 to Sow-km 1.141

Fairway adjustment with construction of anchored sheet piling including equipment

WNA Berlin is planning to adjust the fairway in the Spree estuary area between HOW - km 0.288 to SOW - km 1.141.

The following services are part of the construction project:

- Spandauer Horn excavation (SOW North - km 0.203 to km 0.221; HOW - km 0.190 to 0.288)

- Spreeschanze shallow water zone, former berth (SOW Nord - km 0.221 to km 0.403)

- Sheet pile wall Spreeschanze (SOW North - km 0.385 to km 0.619)

- New waiting points (SOW North - km 0.619 to km 1.141)

- Sheet pile wall junction Ruhlebener Altarm (SOW South - km 0.179 to km 0.246)

- Channel depression - floor dredging (SOW - km 0.100 to km 1.141; HOW - km 0.110 to km 0.288)

- New replacement drinking water culvert WSA Spree-Havel SOW - km 0.544

- Dismantling culvert bell line SOW - km 0.574

- Dismantling gas culvert SOW - km 0.351

A division of services into lots is not envisaged.

The Spandau Horn is excavated and secured with a new anchored sheet pile wall. The subsequent former berth is converted into a shallow water zone by placing an unanchored wave protection wall (with closable openings) in front of it. The adjoining area will be secured with newly erected steel sheet piles and expanded as a waiting station in the range of SOW km 0.619 to km 1.141. The branch into the Ruhlebener old arm is provided with a sole protection.

An existing drinking water culvert is to be dismantled and replaced by a new building.

A gas culvert that has been out of operation for a long time is also to be dismantled.

In the run-up to the work, a search for and, if necessary, evacuation of weapons should take place

After the work is completed, planting of the site is planned.

Essentially, the following service ranges must be performed according to ZTV-W:

LB 202 - Technical processing

- Creation of execution planning

- Creation of inventory documents

- surveying services

- Services according to construction site regulations

- Further technical processing (concepts, coordination, etc.)

LB 203 - Subsoil development and drilling work

- Explosive ordnance explorations and ordnance clearance

LB 204 - Construction site setup and clearance

- Construction site equipment including site office

- signage

- Securing construction sites

- Maintain barges

LB 207 - Landscaping

- Stubben grubbing

- tree protection

- Insertion of lying dead wood in FEZ

- Production of kingfisher replacement quarters

- planting work

- completion care

- development maintenance

ordnance sounding and clearance

- Probing of soundings (e.g. piling lines...)

- ordnance clearance on suspicion

Surveying services

- Surveying during construction (including stakeouts, measurements...)

- bearings

- Inventory measurement

Services according to construction site regulations

- Preparation for advance notice

- Creation of SIGE plan

- Position of SIGE coordinator including instructions

LB 205 - Earthworks

- Topsoil removal

- Loosen soil and store temporarily on barges

- Making terrain adjustments, subgrade

- installation and compaction of soil

LB 206 - Wet dredging work

- wet dredging work in the area of the banks and temporary storage on barges

- Wet dredging in the fairway sole area and intermediate storage on barges

- Wet dredging work in the course of work on the removal of culverts

LB 209 - excavation pit laying, soil improvement

- Excavation pit construction for replacement new drinking water culvert WSA Spree-Havel (Sow-km 0.544)

- Fuses for dismantling culverts (Sow-km 0.351)

LB 210 - slope and sole protection

- Production of a sole protection for the sheet pile wall in the Ruhlebener old arm branch

- Production of sole protection in the area of the new waiting centers

LB 214 - Sheet pile walls, piles, anchorages

- dismantling work (pulling sheet piling, steel dolphins...)

- pile driving (bank walls as steel sheet piles)

- Creation of a back-anchoring (permanent grouting anchor, taping with anchor connection)

- Construction of excavation pits for the replacement of a new culvert at Sow-km 0.544

- Safeguarding work for the dismantling of a culvert at SOW km 0.351

LB 215 - Hydraulic structures made of concrete and reinforced concrete

- Demolition and demolition work in the area of existing bank fortification

LB 217 - Hydraulic engineering equipment

- Production of sheet piling beams

- manufacture of climbing ladders

- Manufacturing equipment new waiting points (bollards, handrails, protective anchor heads)

- manufacturing equipment wave protection wall flat water zone (dam beam openings, openings with transport gabions, spierpoles)

- Jetty including access, equipment and mooring lines for the Spree-Havel ESC

LB 218 - Corrosion protection in hydraulic steel construction

- Production of corrosion protection for systems exposed to water, including required marking coatings

LB 043 - Pressure pipelines for gas, water and waste water

- Replacement construction of a drinking water culvert including temporary construction

Sampling and analysis

- Sampling and analysis (by sections)

Transport, handling and disposal

- transport by waterway to disposer/transshipment point

The following main quantities have to be implemented structurally:

- Pull and dispose of approx. 4,900 m² of sheet piling

- Break off approx. 110 m sheet piling spar

- Loosen and temporarily store approx. 13,400 m3 of soil

- approx. 34,500 m3 of wet dredging work including intermediate storage on barges

- Dismantle approx. 2,400 m³ deck

- Install and compact approx. 11,400 m³ of soil

- Deliver approx. 2,400 t sheet piling

- insert approx. 17,300 m² sheet piling

- Make approx. 400 permanent grouting anchors including connections

- produce approx. 1,000 m cover spar

The following construction services are to be provided for the adaptation of third-party structures:

- Adaptation of the run-out structure Sow-km 0.488, -part B-,

- Construction of a measuring station at Sow-km 4.450 and dismantling of the existing measuring station at SOW-km 0.650, -part C-,

- Dismantling of double cable connector for SoW km 0.890, -part D-

Download full details as .pdf