Hot-water boilers | Tenderlake

Hot-water boilers

Contract Value:
-
Notice Type:
Contract Notice
Published Date:
13 January 2023
Closing Date:
14 February 2023
Location(s):
PL812 Chełmsko-zamojski (PL Poland/POLSKA)
Description:
Delivery, installation and commissioning of a container boiler room consisting of 2 pcs. gas-oil boilers with a capacity of 5 MW each with two fuel storage facilities

The subject of the contract is the performance of the task entitled: Delivery, installation and commissioning of a container boiler room consisting of 2 pcs. gas-oil boilers with a capacity of 5MW each with two fuel storage facilities along with the boiler room inspection and service service.

The subject of the contract is the performance of the task entitled: Delivery, installation and commissioning of a container boiler room consisting of 2 pcs. gas-oil boilers with a capacity of 5MW each with two fuel storage facilities along with the boiler room inspection and service service.

Detailed scope of the order:

1. Development of complete design documentation for the installation of two gas-oil boilers

with a nominal heating power of 5MW each with the use of two-media burners (oil and gas) with a nominal heating power on each of the fuels, in mobile, container design, adapted to road transport, along with a flue gas exhaust system and individual chimneys for each boiler unit.

2. Development of complete design documentation for the foundation of two gas-oil boilers in mobile, container design, along with separate chimneys.

3. Development of complete design documentation for light oil storage installations and above-ground oil storage tanks.

4. The design documentation should also include all necessary auxiliary installations to ensure safe operation of the above-mentioned boilers.

5. Obtaining the necessary arrangements and administrative decisions, including installation permits, occupancy permits, in order to implement the subject of the contract and transfer to operation and notifications necessary to receive final acceptance (including UDT, )

6. Purchase, delivery and installation with commissioning and commissioning of two gas-oil boilers with a heating capacity of 5MW each, in a mobile, container version, adapted for road transport, each equipped with a fuel warehouse with a capacity of V = 30 m3 with full equipment.

7. Design, delivery, installation, commissioning, commissioning and commissioning of other necessary systems and installations ensuring the functionality of oil and gas boilers.

8. Execution of electrical installations and I&C systems with the possibility of full visualization (full information about the status of equipment and process) as well as control and regulation of boiler processes and accompanying installations based on the functioning Master System of the Heating Plant.

9. Start-up and test operation of each boiler.

10. Optimization of boiler operation and transfer to warranty measurements.

11. Obtaining an occupancy permit and commissioning the installation (in accordance with

with legal requirements).

12. Development of as-built documentation.

13. Development of guidelines for the operation of devices and installations.

14. Development of operating instructions.

15. Training of the Ordering Party's staff.

16. Commissioning of all installations and facilities.

Description of the parameters of the installation with which the boilers are to cooperate:

a) the temperature of return of the heating network water plus 50÷70 ° C

b) supply temperature to the heating network plus 70÷125 ° C

c) maximum water temperature behind the boiler plus 150 ° C

d) working pressure 1.6 MPa

e) boiler water according to PN-EN 12952-12

Download full details as .pdf
The Buyer:
Miejskie Przedsiębiorstwo Energetyki Cieplnej Sp. z o.o.
CPV Code(s):
42161000 - Hot-water boilers
42164000 - Auxiliary plant for use with boilers
45331110 - Boiler installation work
71321200 - Heating-system design services