The object of the investment is the construction of sanitary sewerage system, together with the construction and reconstruction of the necessary infrastructure in the field of New Chechło sołectwa. The route of the sewerage system passes in the territory of Świerklaniec municipality in Nowe Chechło, along streets including Lasowicka, Leśna, Konopnicka.
The scope of the study includes:
— construction of a sanitary sewer network with the construction of branches to the confines of adjacent real estate,
— reconstruction and repair of the water supply network and recreation of sections degraded during construction works,
— repair of the rainwater sewer network with beads for street inlets and recreation of sections degraded during construction works,
— the construction of cover pipes on existing cables.
Summary of the length of the designed networks:
1. sanitary sewage system — 3,301,0 m,
2. rainwater sewer — 10 m,
3. water supply network — 97 m.
A detailed description of the object of the order is the design documentation, which is Annex 1 to the SWZ.
The object of the investment is the construction of sanitary sewerage system, together with the construction and reconstruction of the necessary infrastructure in the field of New Chechło sołectwa. The route of the sewerage system passes in the territory of Świerklaniec municipality in Nowe Chechło, along streets including Lasowicka, Leśna, Konopnicka.
The scope of the study includes:
— construction of a sanitary sewer network with the construction of branches to the confines of adjacent real estate,
— reconstruction and repair of the water supply network and recreation of sections degraded during construction works,
— repair of the rainwater sewer network with beads for street inlets and recreation of sections degraded during construction works,
— the construction of cover pipes on existing cables.
Summary of the length of the designed networks:
1. sanitary sewage system — 3,301,0 m,
2. rainwater sewer — 10 m,
3. water supply network — 97 m.
A detailed description of the object of the order is the design documentation, which is Annex 1 to the SWZ.