After completion of the first construction phase, the extension of the
middle school (MS), adding existing parts as well as supplementing various areas and
Construction of a break hall between the new building, the gym and middle school. In addition, the
Secondary school holdings will be rehabilitated in general. For this purpose, the building is completely cleared.
glazing and sun protection works of the extension Theresen Primary School and Wittelsbacher Middle School,
Wittelsbacherstraße 19, 82110 Germering.
The work includes glazing and sun protection work for the renovation of the
Secondary school inventory, rebuild the auditorium and rebuild of the caretaker's apartment on the roof.
— ca. 93 pieces of wood element windows,
— approx. 170 m2 mullion latch wooden aluminum window with 3-pane insulating glazing,
— external doors (partly with mechanical drive),
— veneers, billboards and liners,
— outdoor solar shading systems,
— RWA systems on three stairwells, mullion transom windows,
— Coloured glass panels.