The construction of approximately five kilometers of noise barriers, including adaptation of road appurtenances along the E40, the exit complex, and a further part on the N44 in Aalter.
Breaking up gutters, crash barriers;
- Preparatory work (clearing litter and waste, sawing off all bushes and trees.
Breaking up -km / hm- poles, breaking up reflector poles, breaking up massifs, breaking up
Crash barriers ...);
- Execution of earthworks,
- Regrooving of canals,
- Construction of sub-foundation type I and foundation of lean concrete, thickness 20 cm,
- Concrete slab produced on site (C30 / 37),
- Construction of gutters and guide structures,
- Delivery and installation of noise barriers,
- Delivery and installation of PVC pipes,
- Delivery and installation of gates and sidewalk gullies,
- Performing concrete foundation soles,
- Placing the necessary markings,
- Drawing up As-built plans,
- Delivery and installation of the necessary site signaling,
- maintenance of the works during the guarantee period.