Electrical engineering.
The new building for senior citizens in Eschborn will have an electrical system with the following equipment:
Building for senior citizens:
- 1 x meter main distribution for electricity meters and outlets for;
- 29 x apartments with 29 x apartment distributors and 29 x media distributors;
- 1 x apartments in general;
- 5 x user units on the ground floor with 5x sub-distributions;
- 1 x sub-distribution for 12 vehicle charging stations;
- 1 x CHP with feed-back meter;
- 1 x photovoltaic system with feedback meter.
Nursing home building:
- 1 x main building distribution with;
- 1 x total electricity meter;
- 1 x photovoltaic system with feedback meter;
- outlets for 6 x subdivisions;
- Cable system NYM 3 x 1.5 mm
- Telecommunication cable system approx. 4,500 m;
- Data cable cat. 7 approx. 17,000 m with approx. 300 RJ45 data sockets;
- Cable laying on cable trays, collecting brackets, protective tubes, parapet ducts;
- Installation devices (switches, sockets, etc.) approx. 3 800 pieces in device boxes;
- LED version with approx. 1,200 lights;
- BK network (senior living) antenna system with approx. 90 antenna sockets and approx. 1 900 m antenna cable;
- Satellite system (nursing home) antenna system with approx. 75 antenna sockets and approx. 2 500 m antenna cable;
- Sun protection system with approx. 200 blind buttons and central control;
- Safety lighting system with 50 rings and approx. 210 safety lights / escape route marking;
- Escape route door terminals approx. 6 pieces;
- LED exterior lighting with approx. 40 lights;
- underground cable system for outdoor system approx. 420 m;
- Supply line for main building distribution for senior citizens, underground cable 4 x 185/95 mm
- Supply line for main building distribution for nursing home underground cable 4 x 120/70 mm
- Supply line for photovoltaic systems underground cable 5 x 50 mm