As part of the STEP AS 2025 expansion step, Basel SBB GB will be partially renewed to ensure its long-term survival. Planned adjustments:
- the sidings E22 - E25 and F81 - F90 will be extended to the maximum possible length. Track group E 83 - E85 is limited to the east,
- In the west, the wheelset competence center will be integrated into the parking facilities with a second additional track F80,
- all new tracks will be electrified so that the existing and the new area of the parking facilities can be used electrically throughout,
- The access road to signal box IV and the (SBB) VU buildings will be relocated to the north between tracks E82 and E83.
As part of the STEP AS 2025 expansion step, Basel SBB GB will be partially renewed to ensure its long-term survival. Planned adjustments:
- the sidings E22 - E25 and F81 - F90 will be extended to the maximum possible length. Track group E 83 - E85 is limited to the east,
- In the west, the wheelset competence center will be integrated into the parking facilities with a second additional track F80,
- all new tracks will be electrified so that the existing and the new area of the parking facilities can be used electrically throughout,
- The access road to signal box IV and the (SBB) VU buildings will be relocated to the north between tracks E82 and E83.