This OJEU notice concerns the proposed grant of three offshore transmission licences to successful bidders to connect 3 offshore wind farms to the GB onshore grid.
TR6 consists of Beatrice Offshore Wind Farm, Hornsea Project One Offshore Windfarm and East Anglia ONE (the Projects).
The tender process will consist of two stages for each Project: an Enhanced Pre-Qualification (EPQ) stage and an Invitation to Tender (ITT) stage, resulting in selection of preferred bidders. Bidders who qualify at the EPQ stage will “passport” into the ITT stage for all Projects which it has indicated it will participate. Where the maximum number of qualified bidders has not been reached for a Project, an additional EPQ stage may be run.
Any bidder wishing to participate in the EPQ stage for any Project or in an additional EPQ stage, if held, must express their interest as per the requirements in the EPQ documentation.
Within UK territorial waters or the UK Renewable Energy Zone (as defined in the Renewable Energy Zone (Designation of Area) Order 2004 (SI 2004 No. 2668). This project is subject to change. The following is currently identified as a qualifying project under regulation 8(6)(a) of the Electricity (Competitive Tenders for Offshore Transmission Licences) Regulations 2015 (the Tender Regulations). The location listed below is based on the most proximate onshore points or on anticipated onshore connection points. Precise information will be available in the tender documents.
Project: Beatrice Offshore Wind Farm.
Developer: SSE Renewables, Copenhagen Infrastructure Partners, and SDIC Power.
Limited Capacity (MW): 588.
Location: The Outer Moray Firth, 13,5 km off the coast of Caithness, Scotland.
Within UK territorial waters or the UK Renewable Energy Zone (as defined in the Renewable Energy Zone (Designation of Area) Order 2004 (SI 2004 No. 2668). This project is subject to change. The following is currently identified as a qualifying project under regulation 8(6)(a) of the Electricity (Competitive Tenders for Offshore Transmission Licences) Regulations 2015 (the Tender Regulations). The location listed below is based on the most proximate onshore points or on anticipated onshore connection points. Precise information will be available in the tender documents.
Project: Hornsea Project One Offshore Wind Farm.
Developer: Ørsted.
Limited Capacity (MW): 1 200.
Location: 120 km East of the Humber Estuary in East Yorkshire.
Within UK territorial waters or the UK Renewable Energy Zone (as defined in the Renewable Energy Zone (Designation of Area) Order 2004 (SI 2004 No. 2668). This project is subject to change. The following is currently identified as a qualifying project under regulation 8(6)(a) of the Electricity (Competitive Tenders for Offshore Transmission Licences) Regulations 2015 (the Tender Regulations). The location listed below is based on the most proximate onshore points or on anticipated onshore connection points. Precise information will be available in the tender documents.
Project: East Anglia One.
Developer: Scottish Power.
Limited Capacity (MW): 714.