Designate designer remodeling and renovation Beringen fire station
See II.2.4
The South West Limburg relief zone wants to thoroughly remodel and renovate the existing Beringen fire station. To achieve this, the HRZ wishes to appoint a designer to guide the CVD in the design, study and follow-up of the works.