Leipzig University Hospital intends to upgrade and expand the infrastructure of the data network across the entire campus on Liebigstraße. The measures take place in a total of 16 buildings. In the aforementioned construction project, distribution rooms are newly expanded or upgraded as needed. These rooms must be equipped with ventilation and refrigeration systems and to connect existing supply systems. All work takes place in stock, mostly under terms of use and in compliance with hospital-specific hygiene.
The installation work takes place in parallel in several buildings, levels and rooms.
The following services are to be performed:
ventilation
— installation and commissioning of pipe fans (approx. 13 pieces)
— laying of spiral rebate pipes of various designs (approx. 200 pieces, as well as approx. 200 m),
— external wall grille DN 125 (approx. 11 pieces).
cold
— inverter outdoor unit (approx. 9 pieces),
— recirculation cooling unit 1.5 kW for wall mounting and accessories (approx. 19 pieces),
— communication wiring (approx. 200 m),
— condensation water insulation in various versions (approx. 500 m)
— fire protection sleeves for pipelines in various versions (approx. 100 pieces),
— Installation climate split indoor unit (about 10 pieces).