Electricity, heating, solar and nuclear energy | Tenderlake

Electricity, heating, solar and nuclear energy

Contract Value:
-
Notice Type:
Contract Notice
Published Date:
24 December 2019
Closing Date:
24 January 2020
Location(s):
PL622 Olsztyński (PL Poland/POLSKA)
Description:
Supply of electricity in the period from 1.4.2020 to 31.3.2021. Kętrzyńska Grupa Grupa Kapitałowa

The subject of the order is the supply of electricity in the period from 01/04/2020. until 31/03/2021 up to 282 abstraction points (PPEs) with a total estimated volume of 2,635.48 MWh, of which:

1) For premises and facilities (Part 1 of the contract) - 2.025.55 MWh - a detailed list of PPE is attached as Annex 1a to the Terms of Reference

2) For the purposes of road lighting (Part 2 of the contract) - 609.93 MWh - a detailed list of PPE is attached as Annex 1b to the Terms of Reference

The forecast electricity consumption indicated above is indicative and may differ from the amount of energy actually consumed during the contract period. Reducing or increasing the amount of energy consumed does not entail any consequences for the contracting parties (recipients), except for the need to pay for the energy actually consumed at the rates specified in the Contract.

2. Quality standards: The subject of the contract is the supply of electricity with specified quality standards in accordance with applicable regulations.


Supply of electricity to premises and facilities

Number of measuring systems accounting for electricity consumed 168 pcs.

2. The awarding entity has included a detailed description of the collection points (PPE) in Annex 1a to the ToR.

3. Estimated electricity consumption over the duration of the contract: 2.025.55 MWh, of which:

Zone I 1,070.71 MWh

Zone II 643.39 MWh

Zone III 309.45 MWh

The above data is indicative. The contractor should take into account possible fluctuations in electricity consumption.

4. Deliveries will take place from 01/04/2020. until 31/03/2021, with the proviso that the details of delivery dates (start and end) in relation to individual collection points are described in Annex 1a to the ToR, column "Delivery period".


Supply of electricity for the needs of road lighting

Number of measuring systems accounting for electricity consumed 114 pcs.

2. The awarding entity has included a detailed description of the collection points (PPE) in Annex 1b to the ToR.

3. Estimated electricity consumption during the contract period 609.93 MWh, of which:

Zone I 150.19 MWh

Zone II 459.74 MWh

Zone III 0.00 MWh

The above data is indicative. The contractor should take into account possible fluctuations in electricity consumption.

4. Deliveries will take place from 01/04/2020. until 31/03/2021, with the proviso that the details of delivery dates (start and end) in relation to individual collection points are described in Annex 1b in the column "Delivery period".

Download full details as .pdf
The Buyer:
Zarząd Powiatu w Kętrzynie - Lider
CPV Code(s):
09300000 - Electricity, heating, solar and nuclear energy