For the basic overhaul of the Hochdonn railway bridge, which is more than 100 years old, structural evidence must be provided for the execution of the steel structure. Most of the evidence must be prepared in advance of the measure, and sometimes during construction - especially in the event of unforeseen damage. In addition to the evidence, a planning of the assembly must be drawn up. This also includes assembly instructions for any necessary supports.
Keywords:
- structural engineering in steel construction;
- railway bridge;
- execution while traffic is running;
- Construction more than 100 years old.
The detailed description of services is part of the draft contract. This is included in the documents that you can view after registration.