The 16: Bodenlegerarbeiten
Part of the building extension
Floor areas:
- Preparatory work floor areas: 1779 m2
- Remove verges and protrusions: 91 m
- Closing cracks and false joints: 550 m
- Primer floor areas: 1779 m2
- Linoleum flooring: 779 m2
- Skirting boards MDF 55/13 mm: 783 m
- Angle profile up to 5mm leg height: 69 m
- Connection of door frames: 48 pcs
- Marking and lettering: 120 m
stairways
- Preparatory work floor areas: 201 m2
- Remove verges and protrusions: 128 m
- Primer floor areas: 201 m2
- Safety stair nosing profile with insert: 144 m
- Stair nosing profile as side. Finish: 54 m
- Linoleum flooring platform: 137 m2
- Steps Linoleum flooring: 125 m
- Skirting boards MDF 55/13 mm: 132 m
- Connection of door frames: 112 pcs
- Tactile guidance system ribbed structure / PU: 136 m
- Finding strips, studded structure / PU: 14 pcs
- Attention fields, studded structure / PU: 12 pcs
- Entrance mats with grosgrain insert: 3 pcs
- Bottom indicator for clean-off / stainless steel, ribbed structure: 2.5 m
- Soil indicator for clean-off / stainless steel,
- Studded structure: 1 pc
Part of the existing building
Floor areas:
- Remove old flooring and skirting board: 574 m2
- Preparatory work floor areas: 574 m2
- Remove edge strips and protrusions: 63 m
- Closing separating joints in the screed: 60 m
- Compensation of height difference with stable filler: 43 m2
- Primer floor areas: 574 m2
- Linoleum flooring: 574 m2
- Übergangsprofil: 65 m
- Skirting boards HDF core 13 x 160 mm: 306 m
- Connection of door frames: 108 pcs
- Synthetic resin screed in small quantities: 11 m2