replacement of hydraulic lifts at the STAD bus depot:
The services will focus on:
The complete removal of the 4 existing bridges, the evacuation of metals and fluids.
Civil engineering and electrical works since the TGBT.
The supply, installation and commissioning of the 5 new lifting bridges (4 bridges as a replacement and an additional bridge).
replacement of hydraulic lifts at the STAD bus depot
The services will focus on:
The complete removal of the 4 existing bridges, the evacuation of metals and fluids.
Civil engineering and electrical works since the TGBT.
The supply, installation and commissioning of the 5 new lifting bridges (4 bridges as a replacement and an additional bridge).