Kirchlengern community, new indoor swimming pool Aqua Fun - demolition work part 2: The Kirchlengern community wants to build a new swimming pool at the location of the outdoor and indoor pool. The old indoor swimming pool will be demolished after the completion of the new building. The new building (entrance level = 64.50 m above sea level) is located directly on the street “Am Hallenbad” and has a sports pool, course pool and children's area on the ground floor. The pool water technology is located in the basement, the ventilation system on the upper floor. The boiler room is delivered to and accessed via the assembly shaft.
Kirchlengern community, new building of the Aqua Fun indoor pool - demolition work, part 2: A new indoor pool is being built on the site of the current indoor and outdoor pool. In the course of the last work on the new Aqua Fun, the old building will be stripped and demolished. Coarse measures:
- 1 indoor pool with brine outdoor pool;
- 1 piece of slide tower;
- rock gardens about 25 cbm;
- Clearance of vegetation around 300 sqm;
- clear the pavement of approx. 300 sqm;
- Deliver and install filling sand, approx. 2 700 cbm.