Screed work 1.BA (building 4 and connectors)
Technical rooms building 4 + connectors:
- 250m² waterproofing floor slab W1.1-E single-layer bitumen welding membrane V60S4 BA
Welding method
- 160m edge insulation strip PE foam D 10mm H 150mm
- 180m² cement screed screed on insulation layer 3kN/m2 C35 F5 D 65mm
- 70m² cement screed screed on separating layer over 5kN/m2 C35 F5 D 115mm
Building 4:
- 750m² waterproofing floor slab W1.1-E single-layer bitumen welding membrane V60S4 BA
Welding method
- 730m² thermal insulation layer floor PS rigid foam EPS D 10-50mm
0,035W/(mK) DEO ds
- 500m² impact sound insulation layer PS rigid foam EPS 3kN/m2 25-2mm or 15-2mm
30MN/m3 0.045W/(mK) DES
- 1565m edge insulation strip PE foam D 10mm H 150mm
- 410m² cement screed screed on insulation layer 3kN/m2 C35 F5 D 60-80mm
- 1400m² heating cement screed 3kN/m2 C35 F5 type A D 70-95mm
Connector:
- 140m² waterproofing floor slab W1.1-E single-layer bitumen welding membrane V60S4 BA
Welding method
- 230m² thermal insulation layer floor PS rigid foam EPS D 10-20mm
0,035W/(mK) DEO ds
- 85m² impact sound insulation layer PS rigid foam EPS 3kN/m2 25-2mm 30MN/m3
0.045W/(mK) DES
- 260m edge insulation strip PE foam D 10mm H 150mm
- 410m² cement screed screed on insulation layer 3kN/m2 C35 F5 D 60-75mm
- 185m² heating cement screed 3kN/m2 C35 F5 type A D 70mm